Question 24

An engineer must generate a checkpoint of the running configuration on a Cisco Nexus Switch. The checkpoint file name must be called "before_maintenance' and should be used for recovering the switch to its pre- maintenance state. The rollback of the checkpoint to running configuration should only occur if no errors occur. Which two configuration commands must be used to meet these requirements? (Choose two.)

Options:

A.

rollback checkpoint rile before_maintenance stop-at-first-failure

B.

rollback running-conflg checkpoint before.maintenance

C.

checkpoint file before_maintenance

D.

checkpoint before.maintenance

E.

rollback running-conflg file before_maintenance atomic

Question 25

An engineer evaluates a UI-based infrastructure management system capable of monitoring and deploying standardize VXLAN BGP EVPN deployments. The storage administrator else need the solution to manage the cisco MDS 9090 series Switches. Which solution meets these requirements?

Options:

A.

Intersight

B.

UCSD

C.

Tetration

D.

DCNM

Question 26

Which statement about the MAC address that the FCoE Initialization Protocol chooses for use by an E-Node in an FCoE implementation is true?

Options:

A.

The FCoE Initialization Protocol uses the burned-in MAC address of the converged network adapter for all FCoE operations.

B.

The FCoE Initialization protocol uses a 24-bit FC-MAP and concatenates a 24-bit Fibre Channel ID to create a fibric-provided MAC address.

C.

The FCoE Initialization Protocol uses 01.00.0C as the first 24 bits of the MAC address and appends a 24-bit Fibre Channel ID to derive a full 48-bit FCoE MAC address.

D.

FCoE does not use a MAC address. The FCoE Initialization Protocol is used to acquire a Fibre Channel ID, and the address is used for all FCoE communications in the same way as Fibre Channel Protocol.

Question 27

Refer to the exhibit. Which information must be added to the script to complete the POAP operation on the Cisco Nexus 9000 Series Switch?

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Page: 6 / 35
Exam Code: 350-601
Exam Name: Implementing Cisco Data Center Core Technologies (DCCOR)
Last Update: Mar 28, 2024
Questions: 473
350-601 pdf

350-601 PDF

$31.5  $90
350-601 Engine

350-601 Testing Engine

$36.75  $105
350-601 PDF + Engine

350-601 PDF + Testing Engine

$49  $140