Summer Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: dealsixty

Passed Exam Today 300-615

Page: 5 / 6
Question 20

A network engineer finds an error that says, "BIOS failed power-on self-test." When the engineer checks the console, they discover that the Cisco UCS Blade firmware upgrade process stopped at the "Configuring and testing memory" stage.

Which set of actions resolves the issue?

Options:

A.

1. Add the CIMC firmware on a server.

2. Initialize the CIMC firmware on a server.

B.

1. Update the BIOS firmware on a server.

2. Activate the BIOS firmware on a server

C.

1. Create a new host firmware package.

2. Assign the host firmware package to the service profile template.

D.

1. Upgrade the firmware on an adapter.

2. Enable the firmware on an adapter.

Question 21

Refer to the exhibit.

A recent configuration change removes the HSRP adjacency between the SW-1 and SW-2 Cisco Nexus switches. The change causes the servers on this subnet to lose Internet access. Which action restores the connectivity of all servers on VLAN 13?

Options:

A.

Disable HSRP IP redirects on SW-1.

B.

Set the HSRP priority to 70 on SW-1.

C.

Activate HSRP preempt on SW-2.

D.

Set the HSRP password on SW-2.

Question 22

Refer to the exhibit. A network engineer must use BGP to route IPv4 and IPv6 routes between R1 and R2. The IPv4 addresses are exchanged as expected between the routers through BGP. The routers have reached an Established BGP state. However, the IPv6 routes from R2 fail to show in the routing table of R1. Which action resolves the issue?

Options:

A.

Create a route map that sets the IPv6 next hop.

B.

Advertise L2VPN EVPN under IPv4 unicast address family

C.

Configure an IPv6 BGP neighbor on R1

D.

Enable IPv6 routing on R1

Question 23

Refer to the exhibit.

A switch is being downgraded to an earlier release because of a problem with the current release. After the switch is downgraded, it can no longer forward traffic. Which action resolves the issue?

Options:

A.

Enable ISSD after the downgrade is complete.

B.

Roll back to the original image.

C.

Reload the switch.

D.

Shut and no shut the interfaces to the FEX.

Page: 5 / 6
Exam Code: 300-615
Exam Name: Troubleshooting Cisco Data Center Infrastructure (DCIT)
Last Update: Apr 18, 2024
Questions: 167
300-615 pdf

300-615 PDF

$36  $90
300-615 Engine

300-615 Testing Engine

$42  $105
300-615 PDF + Engine

300-615 PDF + Testing Engine

$56  $140