Questions 4

Which three components are required to deploy a stretched cluster in a VMware Cloud Foundation environment? (Choose three.)

Options:

A.

vSAN, host overlay and vMotion network stretched across both sites

B.

DHCP on the NSX Edge overlay network

C.

DHCP on the host overlay network

D.

One witness host per site

E.

One witness host per vSAN stretched cluster

F.

vSAN: host overlay and vMotion network per data site

Buy Now
Questions 5

A VMware Cloud Foundation administrator created a Tanzu Namespace in one of the workload domains. Which two functions related to permissions can be performed on the newly created Namespace? (Choose two)

Options:

A.

Add permissions only from the vSphere.local domain.

B.

Permissions can be set to either view or edit.

C.

Add permissions to users from vCenter Single Sign-On identity sources.

D.

Add a custom role to create more granular permissions.

E.

Add permissions to local vSphere with Tanzu users only.

Buy Now
Questions 6

VCF design workshops were conducted, and the architect collected the following customer requirements for the newly planned VCF infrastructure:

• The new VCF infrastructure must target two zones: DEV/UAT and DMZ.

• The security team would like to have full management and network isolation between these two zones

• 12 hosts have been ordered for the solution.

• DEV/UAT workloads must comply with an erasure coding vSAN storage policy with the ability to tolerate the failure of two hosts.

Which workload domain sizing will be required to achieve these requirements?

Options:

A.

12-hosts workload domain for both zones, having a 4-hosts DEV cluster a 4-hosts UAT cluster, and a 4-hosts DMZ cluster

B.

12-hosts workload domain for both zones, having an 8-hosts DEV/UAT cluster, and a 4-hosts DMZ cluster

C.

8-hosts DEV/UAT workload domain, having a 4-hosts DEV cluster and a 4-hosts UAT cluster, in addition to a 4-hosts DMZ workload domain, having a 4-hosts DMZ cluster

D.

8-hosts DEV/UAT workload domain, having an 8-hosts DEV/UAT cluster, and a 4-hosts DMZ workload domain, having a 4-hosts DMZ cluster

Buy Now
Questions 7

Which two configuration steps must a VMware Cloud Foundation administrator apply to achieve north/south connectivity while setting up an edge VM node for a workload domain from the SDDC Manager user interface? (Choose two.)

Options:

A.

ToR Switches VRFs

B.

OSPF Configuration

C.

BGP Configuration

D.

vSphere VDS Uplinks

E.

NSX VDS Uplinks

Buy Now
Page: 1 / 2
Exam Code: 5V0-31.22
Exam Name: VMware Cloud Foundation Specialist (v2)
Last Update: Apr 28, 2024
Questions: 116
5V0-31.22 pdf

5V0-31.22 PDF

$28  $80
5V0-31.22 Engine

5V0-31.22 Testing Engine

$33.25  $95
5V0-31.22 PDF + Engine

5V0-31.22 PDF + Testing Engine

$45.5  $130