One Unix server and one Windows server share the front-end ports CL1-A and CL2-A of a VSP E590 system.
What are two requirements to separate the I/Os of the servers? (Choose two.)
You need to replace a failing power supply (PS) in a VSP E590.
What is the correct procedure?
Which two reconfiguration activities are performed without interrupting host access on a VSP Gx00 system? (Choose two.) Choose 2 answers
A customer wants to upgrade their VSP E790 with a SAS Expansion feature.
What are three requirements? (Choose three.)
Which program is used to perform the “New Installation” procedure on a VSP midrange system?
What are two consequences when a “New Installation” procedure is performed on a VSP Midrange system? (Choose two.)
You are installing a new VSP G700 and are using the Initial Setup Wizard (ISW) for the network configuration.
Which set of IP addresses is configured with the ISW?
A customer wants to change a production RAID group from RAID 5 (7D+1P) to RAID 6 (6D+2P) on a VSP G600 during normal operations. They have just unmapped the LUNs from the channel ports.
What needs to be performed next?
A customer wants to upgrade a VSP G700 to 512 GB RAM capacity.
What is the valid CFM configuration?
A customer wants to change a production RAID Group from RAID 5 (7D+1P) to RAID 6 (6D + 2P) on a VSP G700 during normal operations. They have just unmapped the LUNs from the channel ports.
What needs to be performed next?