Big Cyber Monday Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

2V0-13.25 Exam Dumps - VMware VCP-VCF Architect Questions and Answers

Question # 4

What open source project does vSphere Supervisor use to automate the lifecycle management of VMware Kubernetes Service (VKS) clusters?

Options:

A.

Cluster API

B.

Grafana

C.

Contour

D.

Kubeadm

Buy Now
Question # 5

Which Container Network Interface (CNI) is selected by default in a VMware Kubernetes Service (VKS) workload cluster?

Options:

A.

Antrea

B.

Flannel

C.

Calico

D.

Cilium

Buy Now
Question # 6

During a requirements gathering workshop, several business and technical requirements were captured from the customer.

Which requirement will be classified as a Business Requirement?

Options:

A.

The solution must provide the best end-user experience.

B.

The solution must allow the migration of legacy server infrastructure.

C.

The solution must consider security and resiliency to ensure business continuity.

D.

The solution must provide a component-level SLA of 99.9% or higher.

Buy Now
Question # 7

Requirement: The solution must identify any configuration changes made to the Management Infrastructure every 30 days.

Which three design decisions should the architect make to meet the stated requirements? (Choose three.)

Options:

A.

Configure a Configuration Template for the Management Cluster.

B.

Schedule Configuration Drift to Check the configuration every 30 days.

C.

Configure a Configuration Template for the Management vCenter.

D.

Create a Configuration Template for the Management NSX Manager.

E.

Schedule Configuration Drift to Remediate the configuration every 30 days.

F.

Configure Host Profiles for the Workload Domain.

Buy Now
Question # 8

An architect has compiled a list of design choices following a design workshop with the business stakeholders.

Which statement represents a logical design decision?

Options:

A.

Synchronous data replication will be used to meet the stated Recovery Point Objective (RPO) between site A and B.

B.

Users must experience application availability in under 2 seconds.

C.

Sites A and B will each have a /16 subnet for their networks.

D.

Users must connect to the application servers via a shared Global Load Balancer.

Buy Now
Question # 9

An architect is designing a VMware Cloud Foundation (VCF) deployment to meet the following design requirements:

• Tenants need dedicated external network access.

• The number of NSX Edge clusters should be minimized.

To fulfill these requirements, the architect made a design decision to use a Workload Networking VPC with Full Services Model.

Which additional design decision should be considered as part of the logical network design?

Options:

A.

Deploy the maximum number of 10 NSX Edges into a single Edge cluster.

B.

Install two NSX bare metal Edges with multiple physical interfaces to separate tenants.

C.

Use Virtual Routing and Forwarding (VRF) lite to create a separate VRF TO Gateway for each tenant.

D.

Use NSX Federation providing a dedicated NSX instance for each tenant.

Buy Now
Question # 10

Constraint: Existing stretched cluster model must be used.

Requirement: Minimize management infrastructure downtime.

Which Supervisor deployment model supports the design?

Options:

A.

Three Management Zone Supervisor deployment with HA control plane

B.

Single Management Zone Supervisor deployment with HA control plane

C.

Three Management Zone deployment with Simple Availability control plane

D.

Single Management Zone Supervisor deployment with Simple Availability control plane

Buy Now
Question # 11

A customer is designing a multi-site VMware Cloud Foundation (VCF) and vSAN Data Protection (DP) architecture to ensure business continuity. The customer's support team must validate the failover and recovery processes before being allowed to deploy into production.

Which two validation activities should be included in the strategy to meet the objective? (Choose two.)

Options:

A.

Conduct recovery plan testing annually, as frequent testing may introduce instability in DR environments.

B.

Assess the impact of failover scenarios on application dependencies and inter-site connectivity.

C.

Configure recovery plans based on generic VMware best practices rather than workload-specific requirements to decrease the architecture complexity.

D.

Perform planned and unplanned failover tests in a controlled environment to validate recovery time objectives.

E.

Configure vSphere HA and DRS features to manage disaster recovery automatically, eliminating the need for additional validation.

Buy Now
Question # 12

An architect is designing the network model for a new VMware Cloud Foundation (VCF) solution. During the requirements gathering phase, the customer stated that the VCF solution must comply with the organization's security policy for traffic separation. The customer provided the architect with the following information from the policy:

• The physical network architecture is divided into multiple security zones.

• Traffic is not permitted to traverse between the zones with the exception of pre-approved monitoring tools.

• Physical servers may not be connected to multiple zones via a single network interface.

• Management and Storage traffic must be kept within network zone 1.

• Workload traffic must be kept within network zone 2.

The architect makes a design decision to use two vSphere Distributed Switches per cluster for both the Management and VI Workload domains.

Which two additional design decisions should the architect include in the virtual networking design for the separation of traffic between the vSphere Distributed Switches? (Choose two.)

Options:

A.

Configure one vSphere Distributed Switch for ESX Management, Storage, and vMotion traffic.

B.

Configure one vSphere Distributed Switch for all storage traffic.

C.

Configure one vSphere Distributed Switch for ESX Management, Storage, vMotion traffic and NSX - Host and Edge TEP/Edge Uplinks.

D.

Configure one vSphere Distributed Switch for all workload traffic and all NSX - Host and Edge TEP/Edge Uplinks.

E.

Configure one vSphere Distributed Switch for all NSX - Host and Edge TEP/Edge Uplinks.

Buy Now
Question # 13

An architect is responsible for designing a new VMware Cloud Foundation (VCF)-based Private Cloud solution. During the requirements gathering workshop with key customer stakeholders, the following information was captured:

• The solution must support running 50,000 workloads concurrently across all sites.

• The solution must support the concurrent deployment of up to 10 workloads.

When creating the design document, which design quality should be used to classify the stated requirements?

Options:

A.

Manageability

B.

Recoverability

C.

Performance

D.

Availability

Buy Now
Exam Code: 2V0-13.25
Exam Name: VMware Cloud Foundation 9.0 Architect
Last Update: Dec 7, 2025
Questions: 97
2V0-13.25 pdf

2V0-13.25 PDF

$25.5  $84.99
2V0-13.25 Engine

2V0-13.25 Testing Engine

$28.5  $94.99
2V0-13.25 PDF + Engine

2V0-13.25 PDF + Testing Engine

$40.5  $134.99