Labour Day Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bigdisc65

300-615 Exam Dumps - Cisco CCNP Data Center Questions and Answers

Page: 1 / 6
Questions 4

Refer to the exhibit.

A network engineer is implementing a pair of Cisco Nexus 9000 Series Switches. During the OSPF configuration, the engineer discovers unstable routing in the network. The investigation shows flapping routes after the new switches were introduced. Which set of actions resolves the issue?

Options:

A.

Configure a new IP address on the Ethernet interface toward the OSPF neighbor. Clear the OSPF neighbor.

B.

Configure a new IP address on the Ethernet interface toward the OSPF neighbor. Clear the OSPF process.

C.

Configure a new OSPF priority on the Ethernet interface toward the OSPF neighbor. Clear the OSPF neighbor.

D.

Configure a new IP address on the Loopback interface for the OSPF process. Clear the OSPF process

Buy Now
Questions 5

Refer to the exhibit.

An engineer fails to install Perl in the guest shell on a Cisco Nexus 9000 Series Switch. Which two actions must be taken in the guest shell to resolve the issue? (Choose two.)

Options:

A.

Add the DNS server and suffix.

B.

Add a default gateway and nameserver.

C.

Install the unbound resolver package using curl.

D.

Configure domain-name and nameserver under the management VRF.

E.

Export the http_proxy and https_proxy environment variables

Buy Now
Questions 6

Refer to the exhibit.

A blade that is connected to FI-B fails to boot from a SAN LUN. The boot policy is configured to boot by using vHBA1 as the SAN Primary. Which set of actions resolves the issue?

Options:

A.

• Set ESX01_B zone to VSAN 20.

• Create a new vHBA and assign VSAN 20.

B.

• vHBA1 to VSAN 20 in Service Profile.

• VMware Adapter Policy on vHBA1.

C.

•Apply VMware Adapter Policy on vHBA1

•Change vHBA1 to VSAN 20 in Service Profile

D.

• Set ESX01_B zone to VSAN 20.

• Change vHBA1 to VSAN 20 in Service Profile

Buy Now
Questions 7

Refer to the exhibit. A network engineer deploys scripts to the guest shell of a Cisco Nexus switch. The scripts fail to operate properly due to the limited CPU and file system resources that are assigned by default to the guest shell. The engineer allocated more memory and disk space to the guest shell, but the application continues to fail. Which action resolves the issue?

Options:

A.

Disable and enable bash shell

B.

Reboot the guest shell

C.

Redeploy the bash shell

D.

Upgrade the guest shell

Buy Now
Page: 1 / 6
Exam Code: 300-615
Exam Name: Troubleshooting Cisco Data Center Infrastructure (DCIT)
Last Update: Apr 25, 2024
Questions: 167
300-615 pdf

300-615 PDF

$31.5  $90
300-615 Engine

300-615 Testing Engine

$36.75  $105
300-615 PDF + Engine

300-615 PDF + Testing Engine

$49  $140