Question # 24

The operations and maintenance department budget is to be developed for the next fiscal year based on the first 5 months of actual costs for the current fiscal year. Which of the following formulas should be used to forecast the next fiscal year's budget, assuming no adjustments for inflation?

Options:

A.

current 5-month actual × 5/12

B.

most recent month actual × 12

C.

2 most recent months’ actual × 6

D.

current 5-month actual × 12/5

Buy Now
Question # 25

Child abduction system evaluation is best accomplished by

Options:

A.

administration.

B.

security professionals.

C.

the safety committee.

D.

risk managers.

Buy Now
Question # 26

According to the AIA standard contract, final approval of shop drawings submitted by suppliers of construction materials is typically the responsibility of the

Options:

A.

architect.

B.

construction manager.

C.

owner.

D.

subcontractor.

Buy Now
Question # 27

Which of the following is the NFPA reference code for fire alarm system testing?

Options:

A.

70E

B.

72

C.

99

D.

101

Buy Now
Question # 28

(Base Bid / Alternate A / Alternate B)

Company A: $18,000 / $2,000 / Not available

Company B: $20,000 / $3,000 / Included

Company C: $19,000 / $4,000 / $500

Company D: $19,000 / $4,000 / $1,000

Which company has the LOWEST cost if alternate B is chosen?

Options:

A.

A

B.

B

C.

C

D.

D

Buy Now
Question # 29

Which of the following are used to establish a salary range for a new job category?

market salary analysis

candidate qualifications

review of internal equity

job description

Options:

A.

1, 2, and 3 only

B.

1, 2, and 4 only

C.

1, 3, and 4 only

D.

2, 3, and 4 only

Buy Now
Question # 30

In order to ensure a safe environment for patients, what department must be involved during the planning of all construction projects?

Options:

A.

Information Technology

B.

Biomedical Engineering

C.

Patient Services

D.

Infection Control

Buy Now
Question # 31

The following information is available:

Which building has the best overall building condition?

Options:

A.

1

B.

2

C.

3

D.

4

Buy Now
Question # 32

An energy conservation project involving motion-activated light switches and electronic ballasts is expected to provide a savings of $400/month in utility costs, and reduce labor costs by $25/month. If the payback is estimated at 2.5 years, what is the estimated cost of the project?

Options:

A.

$10,200

B.

$11,250

C.

$12,000

D.

$12,750

Buy Now
Question # 33

Which of the following represents the average power consumed by a single-phase electric motor?

Options:

A.

KVA / PF

B.

kW x PF / 1,000

C.

KVA x PF

D.

amps / PF

Buy Now
Exam Code: CHFM
Exam Name: Certified Health Care Facility Manager (CHFM)
Last Update: Aug 31, 2025
Questions: 108
CHFM pdf

CHFM PDF

$25.5  $84.99
CHFM Engine

CHFM Testing Engine

$28.5  $94.99
CHFM PDF + Engine

CHFM PDF + Testing Engine

$40.5  $134.99