Question # 14

You are developing the code that controls an industrial Espresso machine which will be operated by waiting staff in restaurants.

The machine is rather complicated and has lots of switches and buttons, so in the next iteration instructions will be provided to the operator on a small LCD screen.

A User Story for the Operator-Instructions module is as follows:

"As an operator of the Espresso machine, I would like to know how to steam milk, so I can add steamed milk to the coffee."

The following is a list of risks identified for this story, with assigned probability and impact.

Options:

A.

Operators will not read the instructions and will try various switches and buttons until something works. Probability: Low. Impact: Low

B.

The instructions may be incorrect or appear in the wrong order. Probability: Low. Impact: High

C.

An untrained customer will attempt to use the coffee machine. Probability: High. Impact: High

D.

A small child may try to steam milk. Probability: High. Impact: Low

Buy Now
Question # 15

Which of the following would you expect most likely to be an advantage of the whole-team approach?

Options:

A.

Providing constant availability of executable software throughout the iteration for testing, demonstration, or education purposes

B.

Improved quality of the requirements specification (through examples and automatable tests) when adopting the Acceptance Test-Driven Development practice

C.

Improved code quality produced as the result of the refactoring step performed as part of the test-driven-development technique

D.

Eliminating the schedule risks associated with big-bang integration

Buy Now
Question # 16

Which of the following is the BEST way for a test team to keep its independence when working in an Agile development environment?

Options:

A.

Share the Test Strategy with the Agile development team, but not the details of the Test Cases.

B.

Locate the team that develops the test automation framework in a different location to the Agile development team.

C.

Assign testers to be members of the Agile team, but ensure the testers report to a different manager than the developers.

D.

Co-locate only some of the testers with the Agile development team, while the rest of the testers are in a different location.

Buy Now
Question # 17

Which of the following statements best describes test-driven development?

Options:

A.

A way of developing software where the test cases are developed, and often automated, before the software to run those test cases has been written

B.

A high-level description of the test levels to be performed and the testing within those levels for an organization or programme (one or more projects)

C.

An approach to software development based on iterative incremental development, where requirements and solutions evolve through collaboration between self-organizing cross-functional teams

D.

A way of testing software where test design and test execution occur at the same time, guided by a test charter during time-boxed testing sessions

Buy Now
Question # 18

You are a tester in an agile team. The user story you are due to test is still under development so your tests are blocked. The main issue holding progress on this user story is that the developer's unit tests are constantly failing.

As an agile tester, which of the following actions should you take?

Options:

A.

Review the design of the problematic user story and improve it where possible.

B.

Create a bug report for each of your blocked tests.

C.

Work together with the developer, suggesting reasons why the tests are failing.

D.

Use the time to improve and automate existing test cases of other user stories.

Buy Now
Question # 19

Consider an Agile project aimed at developing a test management tool. This tool allows Test Managers to generate progress reports for test analysis, test design and test execution phases in traditional projects. Consider the following user story of this Agile project:

"As a Test Manager who is looking at a progress report, I want to be able to print this progress report, so that I can keep a hard copy for my daily records."

For this user story the following acceptance criterion is defined:

"Given that I am a Test Manager looking at a progress report,

When I click the 'Print' button,

Then the progress report should be printed"

Based only on the given information, which of the following would you expect most likely to be true?

Options:

A.

Both the user story and the acceptance criterion are expressed in adequate form, but the user story is not testable

B.

Both the user story and the acceptance criterion are expressed in adequate form, but the user story does not describe functionality that is valuable to the user

C.

During the conversation, the acceptance criterion should not be discussed since it is described using the Given-When-Then template

D.

During the conversation, the need to update the acceptance criterion by specifying that a date stamp be visible on the printout could emerge

Buy Now
Question # 20

Which of the following statements about Agile retrospectives is true?

Options:

A.

Agile retrospectives should focus exclusively on improving negative aspects, without wasting time in discussions on what worked well during the iteration

B.

All of the improvements identified in an Agile retrospective must be implemented as soon as possible during the next iteration

C.

Metrics such as burndown charts, velocity, and number of stories completed could be effectively used during Agile retrospectives for process improvement

D.

An Agile retrospective should be held at the end of an iteration only when the number of story points completed by the team in that iteration is lower than the team velocity

Buy Now
Question # 21

You are working in a team preparing a bank loan application. Your task is the preparation of acceptance tests for the following user story:

"IF a customer needs a loan for less than 50,000 Euros and they have made repayments regularly (without any delay) and the customer's monthly income is more than 3000 Euros for the last year, THEN the bank will accept the loan request; in other cases, the bank will not accept the request. A customer assistant is responsible for preparing data for approval but the approval is done by the bank manager."

Which of the following test cases can be treated as acceptance test criteria for the above user story?

1) As a customer assistant I can log in to the system and check the history of the customer account for the last year.

2) As a customer assistant I can log in to the system and check the history of the customer debts and repayments.

3) As a customer assistant I can log in to the system and change my password.

4) As a bank manager I can log in to the system and receive the information of all requests waiting for approval.

5) As a bank manager I can log in to the system and decide whether to approve a loan for a customer.

6) As a bank manager I can log in to the system within 10 seconds.

Options:

A.

Acceptance test criteria are 1, 2, 3 and 6

B.

Acceptance test criteria are 1, 3, 4 and 5

C.

Acceptance test criteria are 2, 4, 5 and 6

D.

Acceptance test criteria are 1, 2, 4 and 5

Buy Now
Question # 22

In a sprint planning, the product owner presents a user story written on a card. The team starts having a discussion with the product owner to get an understanding on how the software should work.

The user story written on the card is:

"As a customer, I want to subscribe to the mailing list so that I can receive the latest deal in an email."

By applying the 3C concept, which ONE of the following statements is CORRECT?

Options:

A.

Conversation should include the acceptance criteria discussion.

B.

The card should contain requirements not the user story.

C.

Product owner has written a user story and confirmation is not needed.

D.

The conversation is not required and the team should start developing.

Buy Now
Question # 23

Which of the following is a risk that continuous integration introduces?

Options:

A.

Teams sometimes over-rely on unit tests and exclude some important system and acceptance tests.

B.

Testers sometimes have too many builds to test, which reduces the quality of testing.

C.

Teams no longer have the ability to run manual tests, as all tests must be automated.

D.

Developer's workload is increased, which can result in a reduction of output.

Buy Now
Exam Code: CTFL-AT
Exam Name: Certified Tester Foundation Level Agile Tester
Last Update: May 17, 2025
Questions: 80
CTFL-AT pdf

CTFL-AT PDF

$29.75  $84.99
CTFL-AT Engine

CTFL-AT Testing Engine

$33.25  $94.99
CTFL-AT PDF + Engine

CTFL-AT PDF + Testing Engine

$47.25  $134.99