Question # 4

Which port needs to be opened between ECS and ESRS for registration of remote support?

Options:

A.

21

B.

3218

C.

9020

D.

9443

Buy Now
Question # 5

Which SNMP version(s) are supported by ECS?

Options:

A.

SNMP v3 only

B.

SNMP v2 only

C.

ECS does not support SNMP

D.

SNMP v2 and SNMP v3

Buy Now
Question # 6

In the Storage Service Layer, which distributed shared service runs on each ECS node to manage transactions and ensure data is committed?

Options:

A.

Unstructured Storage Engine

B.

Server-side encryption

C.

Erasure coding

D.

ECS media-data management

Buy Now
Question # 7

A company has removed the VDC from the replication group and is no longer able to add it back. What is the cause of this issue?

Options:

A.

The same VDC cannot be added back to the replication group, it must be given another name

B.

The VDC cannot be added back to the existing replication group, a new replication group must be created for the VDC

C.

The same VDC can be added back to the replication group, but only before failover processing is completed successfully

D.

Removing the VDC from the replication group initiates failover processing for permanent failures

Buy Now
Question # 8

You are creating a VDC during the ECS configuration process. You get the following error.

Error 7000 (http: 500): An error occurred in the API Service

You check the system and this is what you see:

Storage Pool status: Ready

Nodes: Ready to use

Licenses: OK

What can be causing this error?

Options:

A.

You have not created the system storage pool

B.

You did not want 10 to 15 minutes after creating the storage pool

C.

The VDC access key was typed incorrectly

D.

The endpoints were not supplied as a comma-separated list

Buy Now
Question # 9

You are configuring an ECS system to be used for private cloud storage in a Data Domain Cloud Tier environment. You want to enable higher storage efficiency for archival data in the storage pool to support the backup solution.

What is the recommended configuration?

Options:

A.

8 nodes per storage poolCold Storage enabled

B.

4 nodes per storage poolFederated VDC

C.

8 nodes per storage poolDedicated namespace

D.

4 nodes per storage poolGlobal replication group

Buy Now
Question # 10

You are configuring a DD Cloud Tier and ECS system as part of a LTR cloud backup solution. When adding the Cloud Unit in the Data Domain system you cannot connect to the ECS system.

What is preventing the configuration from being completed?

Options:

A.

The namespace used for DD Cloud Tier is applied to a federated VDC instead of a single VDC.

B.

Two different DD Cloud Units were added as “Dell EMC Elastic Cloud Storage (ECS)”.

C.

Other namespaces reside on the same storage pool where the namespace for DD Cloud Tier is created.

D.

Ports 9020 and 9021 are closed in the firewall between the DD system and the ECS load balancer.

Buy Now
Question # 11

What is the correct order of steps in the ECS software installation process?

Options:

Buy Now
Question # 12

An implementation engineer is installing ECS and sees that node names are not resolving to the public IP address. Which command should they use to validate the ECS DNS configuration?

Options:

A.

cat /etc/resolv.conf

B.

getrackinfo -r

C.

ifconfig

D.

nslookup

Buy Now
Question # 13

Which switch is used to daisy-chain three or fewer ECS racks?

Options:

A.

Customer supplied

B.

Rabbit

C.

Hare

D.

Turtle

Buy Now
Exam Code: D-ECS-DY-23
Exam Name: Dell ECS Deploy 2023 Exam
Last Update: Dec 7, 2025
Questions: 66
D-ECS-DY-23 pdf

D-ECS-DY-23 PDF

$25.5  $84.99
D-ECS-DY-23 Engine

D-ECS-DY-23 Testing Engine

$28.5  $94.99
D-ECS-DY-23 PDF + Engine

D-ECS-DY-23 PDF + Testing Engine

$40.5  $134.99