Which two workload parameters are required to proceed with sizing for a PowerStore solution? (Select 2)
What information must a solution architect gather before they start designing a storage solution?
A technical architect is designing a Dell Unity XT 480 using the System Designer option of Sizer. What is the recommended minimum amount of Flash that they should specify?
A customer has three Dell PowerStore 1000Ts in a cluster and wants to add a PowerStore 5000X. What must they do?
A customer has a data center with applications running on 16 volumes that are presented from a Dell Unity XT system. They want to design a DR site within metro distance with zero RPO using storage-based replication. According to Dell best practices, which design approach minimizes the impact on storage performance?
Which network option should be configured to provide the best iSCSI performance on a Dell Unity XT array?
Which sizer option supports configuration of a Midrange solution with hybrid dynamic pools?
What is recommended maximum cable length for PowerStore back-end NVMe cabling to avoid performance issues?