Question # 14

Huawei inverter AI intelligent arc protection, which automatically cuts off the arc in ( ) seconds in case of emergency.

Options:

A.

0.5

B.

1

C.

2

D.

1.5

Buy Now
Question # 15

Which of the following statements about the design principles of the medium-voltage micro-grid solution is incorrect?

Options:

A.

Ratio PV inverter power and PCS power ≤ 1:1

B.

The number of PCSs corresponding to each ESS must be the same.

C.

A diesel generator must be configured for the micro-grid to prevent the system from losing the black-start power supply after the energy storage is exhausted.

D.

PCS power/Peak power in steady state ≥ 2.0

Buy Now
Question # 16

The intelligent fusion diagnosis system (IV & CV fusion) integrates IV scanning and UAV AI image recognition technologies to implement two converged diagnosis modes: IV and UAV associated inspection, site-wide scanning, and cross-verification.

Options:

A.

True

B.

False

Buy Now
Question # 17

Which of the following features can ensure energy storage safety?

Options:

A.

Active cutoff of battery pack optimizer

B.

Synergy of PV & ESS

C.

TOU

D.

Battery pack plug-and-play

Buy Now
Question # 18

What are the challenges facing enterprises in building photovoltaic?

Options:

A.

Distributed power plants cannot be managed in a unified manner.

B.

Unable to make full use of roof area

C.

High efficiency modules are not available

D.

Poor development quality of PV power plants and many faults

E.

Hidden safety hazards of power station system

Buy Now
Question # 19

Huawei inverters support L4 intelligent arc protection, and the maximum arc detection range is 80 m.

Options:

A.

True

B.

False

Buy Now
Question # 20

The DC fault of the PV system is the biggest security risk of the power station. Huawei uses () to proactively shut down the DC system to prevent the fault from spreading.

Options:

A.

Fire suppression system

B.

Smart terminal temperature monitoring

C.

MPPT insulation monitoring

D.

Smart string disconnection

Buy Now
Question # 21

Which of the following micro-grid scenarios requires a backup time of more than 6 hours?

Options:

A.

Industrial and commercial load micro-network

B.

New city micro-grid

C.

Civil load-like micro-grid

D.

Industrial load micro-grid

Buy Now
Exam Code: H19-260_V2.0
Exam Name: HCSA-Sales-Smart PV V2.0
Last Update: Jul 5, 2026
Questions: 60
H19-260_V2.0 pdf

H19-260_V2.0 PDF

$25.5  $84.99
H19-260_V2.0 Engine

H19-260_V2.0 Testing Engine

$28.5  $94.99
H19-260_V2.0 PDF + Engine

H19-260_V2.0 PDF + Testing Engine

$40.5  $134.99