Spring Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

API-SIEE Exam Dumps - API ICP Programs Questions and Answers

Question # 24

Machine vibration measurement using non contacting probes are taken:

Options:

A.

on horizontal, vertical and the axial directions on the baseplate.

B.

on the shaft at 1.2 times the running speed.

C.

on the frame during residual unbalance with the feet unclamped.

D.

on horizontal, vertical and the axial directions on the bearing housings.

Buy Now
Question # 25

What is the interrupting rating of a piece of equipment?

Options:

A.

The peak current rating that a device has been certified to interrupt

B.

The symmetrical current rating that a device has been certified to safely interrupt

C.

The crest current rating that a device has been certified to safely interrupt

D.

The load current rating that a device has been certified to interrupt

Buy Now
Question # 26

According to API 541, for the bearing temperature rise test, motor bearing stable temperature is defined:

Options:

A.

by the manufacturer's FAT procedure.

B.

as a change of not more than 1°C in 30 minutes.

C.

as a rise of not more than 1°C in one hour.

D.

as a rise of not more than 2°C in one hour.

Buy Now
Question # 27

The Arc Flash PPE is required for:

Options:

A.

work on control circuits with exposed electrical conductors below 120 VAC.

B.

removal of covers on properly installed wireways, junction boxes, and cable trays.

C.

voltage-testing in ac systems with work on energized conductors.

D.

insulated cable examination with no manipulation of cable.

Buy Now
Question # 28

According to API 541, when shall the vendor provide calculated data from the final witness testing?

Options:

A.

Two weeks following testing

B.

Upon request

C.

At time of final shipment

D.

Immediately upon completion of testing

Buy Now
Question # 29

According to ANSI C57.12, each line terminal of a winding shall be tested to what maximum value?

Options:

A.

Switching Impulse Insulation Level

B.

Chopped Wave Insulation Level

C.

Wye-Winding Insulation Level

D.

Basic Lightning Impulse Insulation Level

Buy Now
Question # 30

Deviations from specifications must be approved by the:

Options:

A.

manufacturer's engineer.

B.

vendor's quality manager.

C.

inspection coordinator.

D.

responsible engineer.

Buy Now
Question # 31

Which of the following is a typical topic for the pre-inspection meeting prior to the start of fabrication?

Options:

A.

Employee annual leave planning

B.

Quality requirements such as ITP, NCRs, and inspection frequency

C.

Future plant expansion strategy

D.

End-user operating philosophy only

Buy Now
Question # 32

According to NFPA 70, abrasion protection shall be applied to what component where it passes through metal?

Options:

A.

Conductor insulation

B.

Rigid conduit

C.

Secondary circuits

D.

Semi-rigid conduit

Buy Now
Question # 33

Who is responsible for verifying that Non-conformance report NCR disposition has been properly implemented?

Options:

A.

Vendor's Quality Manager

B.

Inspection Coordinator

C.

Source Inspector

D.

Manufacturing Engineer

Buy Now
Exam Code: API-SIEE
Exam Name: Source Inspector Electrical Equipment
Last Update: Mar 20, 2026
Questions: 110
API-SIEE pdf

API-SIEE PDF

$25.5  $84.99
API-SIEE Engine

API-SIEE Testing Engine

$28.5  $94.99
API-SIEE PDF + Engine

API-SIEE PDF + Testing Engine

$40.5  $134.99