Question # 14

If emergency exit stairwells in a high-rise building are used by tenants for convenient travel between floors, and it is permitted by local jurisdiction, the stairwell doors should be:

Options:

A.

Equipped with fail secure electric mag locks

B.

Unlocked during building occupancy (business hours)

C.

Unlocked on every fourth level except for roof access

D.

Equipped with approved access control devices and two-way intercoms

Buy Now
Question # 15

What applies to a provider of defective or hazardous products or services that unduly threaten a consumer’s personal safety?

Options:

A.

Strict liability

B.

Plaintiff

C.

Defendant

D.

None of the above

Buy Now
Question # 16

To deal with the lack of security, both government organizations have developed guidelines for protecting electric facilities and distribution systems. On the private side, the Edison Electric Institute developed guidelines that have been passed on to the North American Electric Reliability Council (NERC), the U.S. Department of Energy’s coordinator for the U.S. electrical infrastructure. Among other things the guide lines cover:

Options:

A.

Vulnerability/risk analysis

B.

Threat response

C.

Cyber scenario

D.

Emergency detection

Buy Now
Question # 17

Communism has common property and radical Islam has sharing property

Options:

A.

True

B.

False

Buy Now
Question # 18

_______________ defines the problem, set the requirements, discuss solutions and set out punishment for infractions.

Options:

A.

Physical security

B.

Network Security Policy

C.

Forensic investigations

D.

Spam filtering

Buy Now
Question # 19

Which operational test determines parameters such as nuisance alarm rates?

Options:

A.

Safety test

B.

Evaluation test

C.

Performance test

D.

Post-maintenance test

Buy Now
Question # 20

Which of the following risk mitigation options has no cost?

Options:

A.

Risk avoidance

B.

Risk acceptance

C.

Risk limitation

D.

Risk transference

Buy Now
Question # 21

Technical and cost evaluations are part of which phase of project deliverables?

Options:

A.

Installation

B.

Design

C.

Planning

D.

Procurement

Buy Now
Question # 22

Which of the following verifications is included in a security system acceptance test?

Options:

A.

Cameras are aimed and focused properly

B.

Owner can operate the systems without assistance

C.

Cameras facing the rising or setting sun utilize wide dynamic range

D.

System operates as expected 24 hours per day for 15 consecutive calendar days

Buy Now
Question # 23

The process of ensuring that the information is not manipulated in an unauthorized way or corrupted, thus diminishing its value and utility to the organization is called:

Options:

A.

Analysis

B.

Integrity

C.

Security

D.

Availability

Buy Now
Exam Code: ASIS-PSP
Exam Name: Physical Security Professional (PSP) Exam
Last Update: May 24, 2026
Questions: 375
ASIS-PSP pdf

ASIS-PSP PDF

$25.5  $84.99
ASIS-PSP Engine

ASIS-PSP Testing Engine

$28.5  $94.99
ASIS-PSP PDF + Engine

ASIS-PSP PDF + Testing Engine

$40.5  $134.99