During a coordination meeting, project leads ask for a report showing only active clashes between mechanical systems and structural framing in patient-room zones, following the approved clash matrix.
What is the most effective way to provide this report using Model Coordination?
The BIM manager is working in an Architectural model that uses the phases Existing and New Construction . They have linked in a Structural model that uses only Phase 1 for existing and Phase 2 for new construction. After linking, they notice that demolition elements from the Structural model do not display correctly in the demolition views.
Which approach allows the BIM manager to display linked elements correctly based on this phase setup, without changing the phases in the linked model?
What setting should be defined in the Family Template for Mechanical Equipment families intended for use in projects in specific countries?
A client is seeking bids from a range of possible fabricators to determine which will win the contract to join the team.
What settings in Autodesk Forma allow a team to distribute files to a party that is not a project member?
Refer to the exhibit.

Upon opening a model, the following warnings saying “Room Tag is outside of its Room” appear.
What action should the BIM manager ask the design team to take in order to identify any Room Tags that need a leader because the tag may be too big to fit within the room?
The BIM manager is coordinating a multi-building project in which each building must maintain a unique internal coordinate system but share a common origin point for site-wide references.
Which two actions are required to correctly manage the coordinate setup in this scenario? (Select two.)
The project manager would like to verify Autodesk Forma folder permissions assigned to team members but is not familiar with cloud-sharing platforms to access this information.
How can the BIM manager generate the required information?
A regional user group raised awareness about a third-party add-on tool that enables a team to establish thresholds for model warnings. In addition, it automates suppressing warnings deemed negligible to a specific project.
Which two data points should a BIM manager gather to build a business case to have the tool approved for use across the firm? (Select two.)
A client has provided a resource model with many custom shared parameters required to meet the project data-management requirements across all of its projects with the firm. The BIM manager has extracted those parameters to the Parameters Service for wider firm access.
Which tool should a team member use to load the new shared parameters into a project model? (Select the correct tool on the image.)

A Revit model in Autodesk Forma that does not have any consultant links is opening for all team members except one. The project BIM manager has already audited and compacted the model.
What should the BIM manager do so that the team member can open the model?