Summer Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: dealsixty

C_TS422_2023 Exam Dumps - SAP Certified Application Specialist Questions and Answers

Question # 4

During production order creation, several valid production versions are found. How does the system choose the production version?

Options:

A.

Alphanumeric or quota arrangement

B.

Planned order or material number

C.

Validity period or sales order

D.

Lot size or material cost

Buy Now
Question # 5

What will happen in the MRP run if you have created a new MRP-relevant material that supports both in-house production and external procurement?

Options:

A.

The MRP run assumes external procurement.

B.

The MRP run assumes in-house production.

C.

The MRP run plans the material only if a quotation has been maintained.

D.

The MRP run does NOT consider the material; it has to be planned interactively.

Buy Now
Question # 6

Which of the following automation options can you use for production orders? Note: There are 2 correct answers to this question.

Options:

A.

You can use trigger points to automatically create rework orders via confirmations.

B.

You can use mass processing to set production orders to technically complete.

C.

You can use the production scheduling profile to automatically set orders to technically complete.

D.

You can use mass processing to read PP master data for production orders.

Buy Now
Question # 7

What data can you maintain in the sub-items of a bill of material (BOM)? Note: There are 2 correct answers to this question.

Options:

A.

Quantity

B.

Status

C.

Installation point

D.

Scrap percentage

Buy Now
Question # 8

You want to set up a make-to-order planning scenario for a finished product. The bill of material contains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?

Options:

A.

Choose planning strategy 50 (Planning without final assembly) and select the corresponding Individual/Collective indicator.

B.

Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator.

C.

Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator.

D.

Choose planning strategy 20 (Make-to-Order) and select the corresponding Individual/Collective indicator.

Buy Now
Question # 9

Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks? Note: There are 2 correct answers to this question.

Options:

A.

Use batch determination.

B.

Use the Batch Information Cockpit.

C.

Use the batch where-used list.

D.

Use batch derivation.

Buy Now
Question # 10

For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question.

Options:

A.

The deletion flag must NOT be set for the bill of material (BOM) or the routing.

B.

The consistency check must be performed.

C.

The assigned routing and bill of material (BOM) must be valid in the entire validity period.

D.

The assigned routing and bill of material (BOM) must have the same validity period.

E.

The lot size range must be within the lot size range of the assigned routing.

Buy Now
Question # 11

Which of the following questions do you have to answer before you start creating a bill of material (BOM)? Note: There are 2 correct answers to this question.

Options:

A.

In which storage location is the BOM required?

B.

Is the material type allowed in the BOM?

C.

Which base unit of measure does the material have?

D.

What status does the BOM have?

Buy Now
Question # 12

What are some benefits of planning with planned independent requirements for finished materials? Note: There are 2 correct answers to this question.

Options:

A.

Reduced delivery times

B.

Reduced times for final assembly

C.

Option to forecast planning for production resources

D.

Option to use make-to-order production

Buy Now
Question # 13

How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.

Options:

A.

Execute an infinite production planning run for the critical resources.

B.

Reduce the planning time interval.

C.

Determine a time period with available capacity on the planning board.

D.

Increase the capacity supply in a time-phased interval.

E.

Form optimum sequences to reduce setup times.

Buy Now
Exam Code: C_TS422_2023
Exam Name: SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing
Last Update: Apr 29, 2025
Questions: 80
C_TS422_2023 pdf

C_TS422_2023 PDF

$34  $84.99
C_TS422_2023 Engine

C_TS422_2023 Testing Engine

$38  $94.99
C_TS422_2023 PDF + Engine

C_TS422_2023 PDF + Testing Engine

$54  $134.99