Weekend Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bigdisc65

CTS-I Exam Dumps - AVIXA Communications Certifications Questions and Answers

Question # 34

The point at which power enters a building is called the _____.

Options:

A.

service entrance

B.

hot spot

C.

facility drop

D.

demark

Buy Now
Question # 35

Which set of drawings would you reference to locate the power outlet for a video display?

Options:

A.

Structural drawings

B.

Mechanical drawings

C.

Electrical drawings

D.

System drawings

Buy Now
Question # 36

The _____ microphone has a long and narrow polar pattern, and is often used in film and television.

Options:

A.

surface mount

B.

shotgun

C.

lavalier

D.

Gooseneck

Buy Now
Question # 37

What is the main function of a graphic or parametric equalizer?

Options:

A.

to adjust frequencies with fixed bandwidths

B.

to adjust the bass and treble tones in audio

C.

to balance voice, music, and other audio signals

D.

to boost or cut a specific frequency range

Buy Now
Question # 38

The red wire in a loudspeaker cable carries a _ signal.

Options:

A.

ground

B.

negative

C.

positive

D.

neutral

Buy Now
Question # 39

Why do wall-mounted racks with swing-out glass doors require special attention during installation? (Choose all that apply.)

Options:

A.

The swing-out door could jam in the carpet.

B.

The door may require installation before mounting the equipment.

C.

The door could pinch the cables.

D.

The door gets in the way of mounting the equipment.

Buy Now
Question # 40

_____ refers to the hardware's elasticity. This is how much stress the material can withstand before it physically stretches.

Options:

A.

Shock load

B.

Tensile strength

C.

Pull out

D.

Shear

Buy Now
Question # 41

In a _____ loudspeaker circuit, you will connect a positive wire from an amplifier to another positive wire on each of the loudspeakers in the circuit.

Options:

A.

Parallel

B.

Series

Buy Now
Question # 42

What document is used to account for lost time due to other trades during a project?

Options:

A.

Punch list

B.

Daily Progress report

C.

RFI

D.

Submittals

Buy Now
Question # 43

Before installation begins, it is most important to:

Options:

A.

Have a clear understanding of the scope of work

B.

Ensure all equipment is delivered

C.

Verify the power requirements

D.

Check the cable inventory

Buy Now
Exam Code: CTS-I
Exam Name: Certified Technology Specialist – Installation
Last Update: Aug 17, 2025
Questions: 477
CTS-I pdf

CTS-I PDF

$29.75  $84.99
CTS-I Engine

CTS-I Testing Engine

$33.25  $94.99
CTS-I PDF + Engine

CTS-I PDF + Testing Engine

$47.25  $134.99