Free Access USGBC LEED-AP-BD+C New Release

Page: 11 / 17
Question 44

Discussing the project goals to help identify the credits and options that the team should attempt is an example of

Options:

A.

documenting LEED credits

B.

creating the Basis of Design (BOD)

C.

developing the LEED Scorecard

D.

implementing the Commissioning (Cx) Plan

Question 45

The scope of analysis in Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 4.

Whole-Building Life-Cycle Assessment is a

Options:

A.

gate-to-gate assessment

B.

cradle-to-gate assessment

C.

cradle-to-grave assessment

D.

cradle-to-cradle assessment

Question 46

An HVAC system consists of an air handler supplying conditioned air (mixture of return air andoutdoor air) to anoffice, corridor, conference room and lobby. For Indoor Environmental Quality Prerequisite, Minimum Indoor AirQuality Performance, the ventilation rate procedure calculations must be based upon what HVAC systemconfiguration?

Options:

A.

Single-zone system

B.

Multiple-zone system

C.

Mixed-mode system

D.

100% outdoor air system

Question 47

During the early stages of a LEED for Schools project, the team was able to reduce the number of lighting fixtures in classrooms by 25% because the project team selected paint color whose light reflectance value was 75% instead of the initially proposed 64% value. This strategy is an example of applying which of the following credits to the project?

Options:

A.

Innovation Credit, Innovation

B.

Integrative Process Credit

C.

Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control

D.

Materials and Resources Credit, Interiors Life-Cycle Impact Reduction

Page: 11 / 17
Exam Code: LEED-AP-BD+C
Exam Name: LEED AP Building Design + Construction (LEED AP BD+C)
Last Update: May 19, 2024
Questions: 232
LEED-AP-BD+C pdf

LEED-AP-BD+C PDF

$28  $80
LEED-AP-BD+C Engine

LEED-AP-BD+C Testing Engine

$33.25  $95
LEED-AP-BD+C PDF + Engine

LEED-AP-BD+C PDF + Testing Engine

$45.5  $130