Black Friday Mega Drop - Up to 75% Off Best Sellers - Ends in 0d 00h 00m 00s - Coupon code: certbig75

LEED-AP-BD+C Exam Dumps - USGBC Leadership in Energy and Environmental Design (LEED) Questions and Answers

Question # 4

When should a preliminary water budget analysis be conducted?

Options:

A.

At the time the design development is completed

B.

At the time the plumbing contractor is selected

C.

After completion of schematic design

D.

Before completion of schematic design

Buy Now
Question # 5

Which additional requirement must a project team meet to earn a second point for reducing carbon emissions from construction activities, beyond tracking all fuel and utility usage for contractor jobsite operations?

Options:

A.

Install a temporary solar-panel system on the construction site to offset emissions

B.

Track and report all combustion-fuel and energy use for the contractor and all subcontractors

C.

Submit a life-cycle assessment of all building materials used in the project

Buy Now
Question # 6

When measuring sound pressure levels in a classroom to determine compliance with the HVAC background noise requirements of LEED Building Design and Construction: Schools, Indoor Environmental Quality Prerequisite, Minimum Acoustic Performance, what testing conditions are appropriate for the classroom?

Options:

A.

Furnished, teacher speaking, HVAC operating at maximum flow rates

B.

Unfurnished, teacher speaking, HVAC operating at typical level

C.

Furnished, no occupants, HVAC operating at typical level

D.

Unfurnished, no occupants, HVAC operating at maximum flow rates

Buy Now
Question # 7

A decorative overhead light fixture is specified for a project that costs $1,500 USD and uses recycled water bottles as part of the diffuser shade. The shades are 10% of the overall weight of the fixture and are 50% post-consumer recycled content. Assuming no other portions of the fixture meet sustainability criteria, what would the contributing value of the fixture be?

Options:

A.

$75

B.

$150

C.

$750

D.

$1,500

Buy Now
Question # 8

A downtown office building is unable to construct dedicated parking for its occupants. However, the building developer has partnered with a parking garage to offer discounted parking for its occupants. If the discounted parking rate is $450 per month, how much must the rate be for green vehicles for the building to receive one point for Location and Transportation Credit, Green Vehicles?

Options:

A.

$90

B.

$225

C.

$360

D.

$405

Buy Now
Question # 9

Which of the following strategies can be used to reduce the internal load of a building?

Options:

A.

Decreasing lighting power

B.

Oversize the HVAC systems

C.

Install low reflective exterior facade

D.

Increase the insulating value of the glazing and window frame system

Buy Now
Question # 10

A Healthcare Project is constructing a new building adjacent to an existing LEED Certified hospital facility. The new building ' s location is on the same hospital campus as the certified facility. The entire hospital campus was analyzed with an Environmental Site Assessment (ESA) as part of the certified facility ' s project scope. The new building project needs to complete a new Phase I ESA if

Options:

A.

the Phase II ESA uncovers suspected contamination

B.

contamination was identified by the certified facility

C.

the certified facility ' s Phase I ESA is older than 180 days

D.

the local equivalent standard is more stringent than ASTM E1527-05

Buy Now
Question # 11

A new five-story building with a 30,000 ft2 (2 800 m2) footprint is being designed on a previously disturbed100,000 ft2 (9 290 m2) site. The remaining on-grade surface will be 35,000 ft2 (3 250 m2) of asphalt parking, and 35,000 ft2 (3 250 m2) of native vegetated open space. To achieve a point for exemplary performance under Option 1 of Sustainable Sites Credit, Site Development - Protect or Restore Habitat, the design team will have to incorporate a native and/or adapted vegetated roof with a minimum area of

Options:

A.

12,500 ft2 (1 160 m2)

B.

15,000 ft2 (1 400 m2)

C.

25,000 ft2 (2 300 m2)

D.

35,000 ft2 (3 250 m2)

Buy Now
Question # 12

The project landscape architect suggests reducing the area planned for surface parking and replacing it with additional vegetated space. What benefit would this strategy provide to the owner?

Options:

A.

Increases the rainwater infiltration capacity

B.

Decreases the amount of bicycle parking that must be provided

C.

Increases the overall SR (solar reflectance) of the hardscape area

D.

Decreases the required amount of on-street parking that must be provided

Buy Now
Question # 13

What is a benefit of including the public in a charrette for a new school before the pre-design phase?

Options:

A.

Neighbors can plan for future construction

B.

It will help streamline the permitting process

C.

Potential partnerships with the community can be revealed

D.

The owner can determine financial strategies based on the public ' s input

Buy Now
Exam Code: LEED-AP-BD+C
Exam Name: LEED AP Building Design + Construction (LEED v5 AP BD+C)
Last Update: Nov 23, 2026
Questions: 454
LEED-AP-BD+C pdf

LEED-AP-BD+C PDF

$22.5  $89.99
LEED-AP-BD+C Engine

LEED-AP-BD+C Testing Engine

$25  $99.99
LEED-AP-BD+C PDF + Engine

LEED-AP-BD+C PDF + Testing Engine

$35  $139.99