Which of the following elements is considered in EDGE to estimate water use in homes?
Company A is developing a logistic center of 15,000 m² in Kenya. The project consists of 14,000 m² of warehouse space, 500 m² of office space, and 500 m² of technical areas mechanical and electrical. The company is looking for a single certification for the project. Which EDGE Building type should be selected for the certification?
For a project in a hot and dry climate with no air-conditioning system, which of the following will NOT have an impact on the occupants' thermal comfort?
Ceiling fans are an efficient way to increase air movement and therefore thermal comfort. Which of the following forms part of the evidence to demonstrate compliance at the design stage?
Which of the following may NOT lead to a higher adoption of green building practices?
During a design audit, an EDGE Auditor notices that the project does not meet the EDGE standard for energy. Which of the following is an acceptable course of action for the Auditor?
An EDGE Auditor has received initial documentation from a Client which implies that measures not selected on the downloaded PDF can be claimed. What should the Auditor do?
In the EDGE certification system, who is responsible for the entire project including providing project documentation, access to the site, and the payment of audit and certification fees?