Pre-Summer Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

HPE0-V27 Exam Dumps - HP ACMX Questions and Answers

Question # 14

You are configuring an HPE GreenLake for Azure Stack HCI solution using the HPE Solution Sales Enablement Tool (SSET). Why are top-of-rack switches unavailable in the wizard?

Options:

A.

Switches are not included in the HPE GreenLake for Azure Stack HCI solution.

B.

SSET automatically adds switches to the BOM once necessary input is entered to the form.

C.

External switches are not needed for the HPE GreenLake for Azure Stack HCI solution.

D.

SSET cannot be used for HPE GreenLake for Azure Stack HCI sizing.

Buy Now
Question # 15

Which statement about the CloudPhysics report shown (vCenter Summary) is correct?

Options:

A.

There are 3 ESXi hosts in the cluster.

B.

There is 27.22TB of storage capacity in the cluster.

C.

There are 3 VLANs present in the cluster.

D.

The cluster has enough resources for HA to restart all VMs in the event of a host failure.

Buy Now
Question # 16

Your client needs a departmental Storage array to host a VDI workload at a remote office. The networking infrastructure is limited and the client has decided to connect the ESXi host servers with 12Gbps SAS.

Which HPE Storage product will meet their requirements?

Options:

A.

HPEAIIetra 9060

B.

HPE Nimble AF20

C.

HPE MSA 2062

D.

HPE Alletra 6030

Buy Now
Question # 17

Your customer is considering a new HPE Alletra 9060 to service their mission critical database workloads.

Their CFO is concerned with the cost of the unused excess storage capacity that will service unforeseen future growth.

What business values does HPE GreenLake for Block Storage provide that could alleviate this concern?

Options:

A.

It offers CapEx purchases so the client can depreciate the storage assets.

B.

It sets the minimum capacity commitment level to the required capacity.

C.

It provides storage capacity on an as-needed basis at a predetermined cost per GB.

D.

It provides a fixed monthly cost, regardless of the storage consumption.

Buy Now
Question # 18

Which components are part of HPE GreenLake Data Protection. (Choose two.)

Options:

A.

Application mobility

B.

Disaster recovery

C.

Azure blob backup

D.

CSI plugin

E.

Object gateway

Buy Now
Question # 19

You are presenting an HPE Alletra 9000 solution to the customer. They ask for a high level implementation check list to prepare their site ahead of the implementation.

What resource can you share with the customer to aid you in providing this check list?

Options:

A.

Welcome Center

B.

IData Services Cloud Console

C.

SmartClD

D.

SPOCK

Buy Now
Question # 20

You are presenting an HPE GreenLake for Private Cloud Enterprise proposal.

Which of the following statements is true?

Options:

A.

It only supports containerized workloads.

B.

It only supports virtualization workloads.

C.

It can support both containerized and virtualization workloads at the same time.

D.

It can support either containerized or virtualization workloads, but not at the same time.

Buy Now
Question # 21

You are designing a new datacenter solution for a customer with a limited power footprint.

Which tools can you use to present the power consumption of proposed solution to the customer? (Choose two.)

Options:

A.

OCA

B.

NinjaSTARS

C.

SSET

D.

Product Bulletin

E.

Power Advisor

Buy Now
Question # 22

Your customer needs a petabyte scale, geo-dispersed object Storage Platform.

Which Alliance solution will meet their requirement?

Options:

A.

HPE Solutions for Scalitv ARTESCA

B.

HPE Solutions for Qumulo

C.

HPE Solutions for Scalitv RING

D.

HPE Solutions for Cohesity

Buy Now
Question # 23

Your customer needs to deploy compute infrastructure in a harsh environment with inlet temperatures exceeding ASHRAE Class4, up to 55 degrees C.

Which HPE compute offering should you recommend?

Options:

A.

HPE Apollo 6500 Gen10 Plus

B.

HPE ProLiant DL380 Den10 Plus

C.

HPE Edgeline 8000

D.

HPE ProLiant DL380 Gen10 Plus Carrier Grade

Buy Now
Exam Code: HPE0-V27
Exam Name: HPE Edge-to-Cloud Solutions
Last Update: May 24, 2026
Questions: 111
HPE0-V27 pdf

HPE0-V27 PDF

$25.5  $84.99
HPE0-V27 Engine

HPE0-V27 Testing Engine

$28.5  $94.99
HPE0-V27 PDF + Engine

HPE0-V27 PDF + Testing Engine

$40.5  $134.99