Spring Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

HPE7-A03 Exam Dumps - HP Aruba Certified Professional - Campus Access Questions and Answers

Question # 24

ACME retail has 38 locations spread out across Ave US states and two provinces in Canada. They are looking to grow 20% over the next two years. They have an HO with a staff of 200 employees. The organization has eight Regional Managers and two VPs who work from home and the road. Stores typically have 17 employees on average per location.

The two warehouses have a remote loading system and 20 employees each to load the trucks and fulfill the online orders. The warehouse has 40-foot ceilings and large metal racks to store inventory. The main location is 240K sq ft (22300 st) m) and the Canadian warehouse Is 130K sq ft (12100 sq ml. The forkllfts on the loading docks are equipped with a wireless tablet on board.

A typical store Is reportedly about 60.000 sq ft (5575 sqm) and smaller stores are planned at 25.000 sq ft '2320 sq mi. The locations need to expand the abilities to vendors that need to add setup displays or Interactive kiosks in the stores. The current Infrastructure was installed In 2015 and used wireless N technology in a coverage model. The wiring is CatS. and they are unsure of the fiber connections. The inventory is all placed on the floor when it is delivered to the local store.

Inventory control is handled through Zebra barcode scanners, and they have had a lot of issues in getting signals throughout the stores and this makes monthly inventory difficult. The organization has a small help desk to troubleshoot issues that happen at the retail locations and PC support for the office. The company is looking to upgrade away from the current pbx system later this year. With the need to grow and cut costs, they are interested in moving the data to the cloud but need to get almost real-time inventory control for the online service to function.

The network has all been wired over the last ten years, but with the new systems being all wireless, they have seen the trend to offer wireless to all the vendors for their needs but also would like to allow employees, guests, and contractors all to use it. With the new IT director starting next week, the project has been set by the CTO of the company. The marketing group has asked how they can interact with the customers and get more info, while the IT support desk needs to cut staff in halt.

The. office has an MDF and two IDFs located on floors one and two. The HOF is in the basement, and you have multiple WAN circuits for the HO links. Each store has a local handoff from the cable company (ethernet) In the middle of the store in the office, so distance for the wiring is not an issue.

The customer has budget concerns but does want something that could last 7+ years.

Which two projects does the customer have in the planning state? (Select two)

Options:

A.

VoIP upgrade

B.

Inventory Control System

C.

kiosks/display station

D.

new POS system

Buy Now
Question # 25

A global cruise line company needs to refresh its current fleet. They win refresh the insides' of the ship to be cost-effective and increase their sustain ability. They Mill replace the complete WLAN/LAN hardware of the ship. In this refresh, the company will not refresh Us current security requirements. The CIO also wants to limit the number of unused ports in the switches. Future expansion will always mean a refresh of hardware. They start with the smallest ship with a maximum of 800 guests

Each ship has a LAN infrastructure consisting of two core switches, up to 10 redundant distribution switches, and up to 500 access switches (400 cabins. 100 technical rooms). The Core switches are located in the MDF of the ship and the distribution switches are located in the IDFs of the ship. Each cabin and technical room gets one single access switch.

The cabling structure of the ship will not be refreshed. Each IDF is connected to the MDF by SMF. of which two pairs are available for the interconnect between the core and distribution. The length of SM fiber between MDF and IDF is less than 300 meters (930 ft) and the type used is 0S1. Each cabin is connected by a single 0M2 pair to the IDF. the maximum length is 60 meters (200 ft). Each technical room is connected by a single 0M2 pail to the IDF. with lengths between 100 and 150 meters (320 and 500 ft).

For each cabin/technical room the customer is looking to replace their current fan-less 2530/2540 without changing the requirements, except they need to upgrade the uplink to distribution switch to 10GbEto handle the increased network traffic, and the technical rooms need redundant power.

The WLAN infrastructure will be 1:1 refreshed without new cabling or new AP locations. Their WLAN Infrastructure is based on the 200/300 series Indoor and outdoor APs running instantOS (less than 300 APs). the customer has no change in WLAN requirements.

The cruise line company will replace its current Internet connection before the LAN/WLAN refresh. The new Internet connection will provide a 99.8% uptime, which is needed to ensure the paid guest Wi-Fi is always operational. With this new internet connection, the CIO of the cruise line wants to base the design on the ESP architecture from Aruba because Internet connection is guaranteed.

Based on the best practices and customer requirements, what is the correct WUN approach?

Options:

A.

ArubaOS10 AP only deployment_____________

B.

Aruba OSS campus deployment

C.

Instant OS 6 deployment

D.

Aruba 0510 AP and gateway deployment

Buy Now
Question # 26

What is the best practice for using VSX at the core of a 3-tier design?

Options:

A.

You should never implement VSX at the core of a 3-tier redundancy core.

B.

You should implement VSX at the core when the aggregation layer is layer 3 only with OSPF-routed traffic forwarding Between the core and aggregation layers.

C.

You should Implement VSX at the core when the aggregation layer operates at layer 2 only.

D.

VSX-lags allow the collapsed core to connect directly to services such as gateways and services only so long as spanning tree is used to prevent loops.

Buy Now
Question # 27

'Don't Buy at Us' is a US-based retail company that is expanding Into Europe. They are expanding into EMEA with a regional headquarters called HQ2 inside The Netherlands.

Their US-based headquarters HQ1 was refreshed last year based on the Aruba ESP architecture. You have treated the design for HQ? based on the same design as HQ1. a two-tier architecture. The high level is shown below.

Switch BOM for this project based on Two Tier:

Collapsed Core: 2 x Aruba 8360-16Y2C in VSX (ISL 2» ICOG0E DAC)

Access Slack: 10 x Slack of Aruba 6200F 48G Class4 PoE 4SFP- 740W each stack has A members. VSF

with 10GbE VSF links) 12 x 10GbE uplink pet stack)

During the presentation of your design to the CTO of "Don't Buy at Us" you were informed about the changes they want you to incorporate into the updated design

1. HQ2 will include the EMEA regional distribution center (EMEA-OISTR) next to the HQ2.

2. Only two pairs of 0S1 are available between HQ2 and EMEA-DlSTR.

3. The uplinks from all access stacks need to increase to 2 x 25GbE. the fiber in HQ2 and EMEA-DI5TRI is certified for 25GbE.

4. EMEA-DlSTR needs at least 7 x stack of Aruba 48 ports switches (each stack has 4 members).

Which answer based on best practice is presenting the correct Switch BOM tor the updated design?

Options:

A.

core: 2 x 8360-12C in VSX (ISL 2x100GbE DAC)

aggregation: 2 x Aggregation stacks, each consists of 2 Aruba 8360-16Y2C in VSX (ISL 2x100GbE DAC, 2 x 25GbE uplinks per stack) access stack: 17 x stack of Aruba 6300F 48-port 1GbE Class 4 PoE and 4-port SFP56 (each stack has 4 members, VSF with 50GbE VSF links, 2 x 25GbE uplinks per stack)

B.

core: 2 x 8360-12C in VSX (ISL 2x100GbE DAC)

aggregation: 2 x aggregation stacks, each consists of 2 Aruba 8360-16Y2C in VSX (ISL 2x100GbE DAC, 2 x 100GbE uplinks per stack) access stack: 17 x stack of Aruba 6300F 48-port 1GbE Class 4 PoE and 4-port SFP56 (each stack has 4 members, VSF with 50GbE VSF links, 2 x 25GbE uplinks per stack)

C.

core: 2 x 8360-12C in VSX (ISL 2x100GbE DAC)

aggregation: 2 x aggregation stacks, each consists of 2 Aruba 8360-32Y4C in VSX (ISL 2x100GbE DAC, 2 x 100GbE uplinks per stack) access stack: 17 x stack of Aruba 6300F 48-port 1GbE Class 4 PoE and 4-port SFP56 (each stack has 4 members, VSF with 50GbE VSF links, 2 x 25GbE uplinks per stack)

D.

collapsed core: 2 x 8360-16Y2C in VSX (ISL 2x100GbE DAC)

access switch: 17 x stack of Aruba 6200F 48G Class4 PoE 4SFP+ 740W (each stack has

4 members, VSF with 10GbE VSF links, 2 x 10GbE uplinks per stack)

Buy Now
Question # 28

Which member types require a reboot when doing an In-Service-Software-Upgrade within a VSF stack?

Options:

A.

Standby

B.

Conductor

C.

Member

D.

all member types

Buy Now
Question # 29

'Don't Buy at Us' is a US-based retail company that is expanding Into Europe. They are expanding into EMEA with a regional headquarters called HQ2 inside The Netherlands.

Their US-based headquarters HQ1 was refreshed last year based on the Aruba ESP architecture. You have treated the design for HQ? based on the same design as HQ1. a two-tier architecture. The high level is shown below.

Switch BOM for this project based on Two Tier:

Collapsed Core: 2 x Aruba 8360-16Y2C in VSX (ISL 2» ICOG0E DAC)

Access Slack: 10 x Slack of Aruba 6200F 48G Class4 PoE 4SFP- 740W each stack has A members. VSF

with 10GbE VSF links) 12 x 10GbE uplink pet stack)

During the presentation of your design to the CTO of 'Don't Buy at Us' you were informed about the updated fiber infrastructure that Don't Buy at Us' has installed in HQ2.

The core stack is Installed in the MDF and per IOF there is one access stack installed. Based on best practice, what is the most cost-effective update to the switch BOM?

Options:

A.

core: 2 x 8360-16Y2C in VSX (ISL 2x100GbE DAC)

access stack: 10 x stack of Aruba 6200F 48G Class4 PoE 4SFP+ 740W (each stack has 4 members, VSF with 10GbE VSF links) (2 x 10GbE uplink per stack) optics: 12 x 10Gbit-SR + 8 x 10Gbit-LR

B.

core: 2 x 8360-16Y2C in VSX (ISL 2x100GbE DAC)

access stack: 10 x stack of HPE Aruba Networking 6200M 48G Class4 PoE 4SFP+ (each stack has 4 members, VSF with 10GbE VSF links) (2 x 10GbE uplink per stack) optics: 12 x 10Gbit-SR + 8 x 10GbiLLR

C.

core: 2 x 8360-16Y2C in VSX (ISL 2x100GbE DAC)

access stack: 10 x stack of Aruba 6200F 48G Class4 PoE 4SFP+ 740W (each stack has 4 members, VSF with 10GbE VSF links) (2 x 10GbE uplink per stack) optics: 10 x 10Gbit-SR + 10 x 10Gbit-LR

D.

core: 2 x 8360-16Y2C in VSX (ISL 2x100GbE DAC)

access stack: 10 x stack of HPE Aruba Networking 6200M 48G Class4 PoE 4SFP+ (each stack has 4 members, VSF with 10GbE VSF links) (2 x 10GbE uplink per stack) optics: 12 x 10Gbit-SR +8 x 10Gbit-LRM

Buy Now
Question # 30

What is one use case for designing a 2-tier campus LAM instead of using a 3-tier?

Options:

A.

The campus has small buildings with only a few wiring closets.

B.

The network has grown beyond a few building aggregation points

C.

Access aggregation points are not scaling to meet traffic demands.

D.

Cross-campus traffic has grown beyond We capacity of a single collapsed core

Buy Now
Question # 31

XYZ Regional Hospital is an integrated healthcare system of hospitals, neighborhood health centers, and small doctor offices. XYZ Regional Hospital has recently merged with 4x neighborhood health centers and 125 doctor branch offices. The wireless, wired access, and AAA

solutions are outdated and need to be replaced

XYZ Regional Hospital is looking to future-proof and improve efficiency across all sites by enhancing wired and wireless access and migrating to a centralized and unified wired/wireless and policy management that can provide uninterrupted availability of all systems.

Locations:

- XYZ Regional Hospital is located in New York City

- Dila Health Center is located in City A

- Mount Health Center is located in City B

- Rock Health Center is located in City C

- Branch clinics are located at different locations across the United States

Requirements:

- Provide, via management software, one single pane of glass to manage wired and wireless IANs. and VPNs across campus, branch, and remote via web/cloud architecture providing near real-time Insight. troubleshooting tools, and Service Level performance reporting.

- Seamless integration across wired, wireless. WAN. SD-Branch. loT

- Provide secure wireless access to all the employees of the Regional Hospital and partners, as well as provide wireless Internet access to medical citizens when they visit our facilities.

- All-access points must support the following features and specifications: 802.11ax (Wi-Fi 6E Certified)

- Security options including WP2/WPA3. 802.1X with Radius secure authentication

- Identify and authenticate every wireless and wired device

- End-to-end role-based security

- Seamless mobility across the hospital tor medical learns, patients, and visitors

- Cuts Wi-Fi deployment times from days to hours and enables Zero-Touch deployments across the site

- Establishes a resilient, future-ready network infrastructure with the intelligence, scalability, and intuitive toolsets to meet emerging needs

- Fully redundant branch solution with dynamic path selection

XYZ Regional Hospital recently acquired an adjacent new building lor outpatient services but no fiber connection currently exists between the new building and the mam hospital.

Requirements:

- the buildings are 900 feet/274 m apart with a line of sight

- provide the same wireless and wired access experience as the main hospital

- managed by the same single pane of management and configuration as the main hospital

What solution should the Network Architect recommend?

Options:

A.

InstantOn mesh solution Central Aruba OS switch

B.

AP mesh solution AirWave CX Switch

C.

Instant AP mesh solution AirWave CX Switch

D.

AP mesh solution Central CX Switch

Buy Now
Exam Code: HPE7-A03
Exam Name: HPE Aruba Networking Certified Network Architect - Campus Access
Last Update: Mar 18, 2026
Questions: 96
HPE7-A03 pdf

HPE7-A03 PDF

$25.5  $84.99
HPE7-A03 Engine

HPE7-A03 Testing Engine

$28.5  $94.99
HPE7-A03 PDF + Engine

HPE7-A03 PDF + Testing Engine

$40.5  $134.99