Question # 44

What type of space may employees be relocated to during a phased remodel project?

Options:

A.

swing

B.

staging

C.

hoteling

D.

pre-move

Buy Now
Question # 45

Which of the following installations would require a structural engineer to be involved?

Options:

A.

A wall-mounted furniture workstation

B.

A demountable partition wall

C.

A non-load-bearing interior wall

D.

An operable partition wall

Buy Now
Question # 46

A project is utilizing existing millwork with new custom countertops. Who is responsible to field verify the existing conditions to generate shop drawings for the new countertops?

Options:

A.

owner

B.

installer

C.

designer

Buy Now
Question # 47

Which of the following is part of an active system for fire protection?

Options:

A.

Area of refuge

B.

Means of egress

C.

Protected stairwells

D.

Pre-action sprinklers

Buy Now
Question # 48

In a project that includes a home renovation and procurement of new furniture, what is the BEST fee structure?

Options:

A.

Hourly fee method and cost-plus method

B.

Square foot method and fixed fee method

C.

Fixed fee method and square foot method

D.

Value-oriented method and hourly fee method

Buy Now
Question # 49

Which are overhead expenses in a design business?

Options:

A.

Rent, taxes and licenses, insurance, advertising, and non-billable support staff

B.

Advertising, accounts payable, marketing, loan payments, utilities, and rent

C.

Utilities, accounts receivable, taxes and licenses, insurance, and rent

D.

Billable support staff, rent, advertising, loan payments, utilities, and insurance

Buy Now
Question # 50

Upon review of all consultants’ drawings, the designer notices that the placement of a water closet is not consistent with the contract documents. What should the designer do?

Options:

A.

Provide the dimensions of the water closet along with a notation on the interior design documents of the water closet’s new location

B.

Coordinate the proper location with all parties through a change order

C.

Coordinate with the mechanical engineer and have the water closet relocated on the engineer’s drawings

D.

No action is necessary because the contractor is obliged to follow the interior design documents

Buy Now
Question # 51

When does a project team gather information about a company’s culture, mission, values, and business goals to understand possible challenges for a new workplace environment?

Options:

A.

programming

B.

client interview

C.

schematic design

D.

design development

Buy Now
Question # 52

What would be included as part of a fire separation (fire assembly)?

Options:

A.

Dampers

B.

Operable window

C.

Low flame-spread rating

D.

Flame retardant wallcovering

Buy Now
Question # 53

What is required prior to occupancy to improve indoor air quality?

Options:

A.

clean the air intake vents

B.

run the mechanical system

C.

test carbon monoxide detectors

Buy Now
Exam Code: IDPX
Exam Name: Interior Design Professional Exam
Last Update: May 23, 2025