Question # 4

Which drawings and information would be presented during the design development phase?

Options:

A.

Preliminary floor plan, elevations, and details

B.

Bubble diagrams, scale models, and finish schedule

C.

Finalized floor plans, 3-D drawings, and finish samples

D.

Criteria matrix, orthographic drawings, and blocking diagrams

Buy Now
Question # 5

Contract documents serve as the legal contract between

Options:

A.

the client and the designer

B.

the client and the contractor

C.

the designer and the contractor

D.

the contractor and the suppliers

Buy Now
Question # 6

During early planning stages of a sustainable project, which of the following elements are the MOST important to develop?

Options:

A.

LED lighting and locally sourced materials

B.

Wind power and recycled content materials

C.

Composting toilets and renewable power sources

Buy Now
Question # 7

What kind of schedule shows which tasks are the highest priority and what the effect will be on the overall project if the tasks take longer than estimated?

Options:

A.

Work Flow

B.

Gantt Chart

C.

Critical Path Method (CPM)

D.

Program Evaluation Review Technique (PERT)

Buy Now
Question # 8

What is the PRIMARY reason to maintain a master submittal log on a project?

Options:

A.

Confirm adherence to the contract

B.

Document the installation schedule

C.

Verify compliance with specifications

D.

Facilitate distribution and timely review

Buy Now
Question # 9

Which statement about change orders is MOST accurate?

Options:

A.

They are written permissions or instructions that modify construction documents

B.

They are notices to the client advising of changes to the construction documents

C.

They are changes made to the contract documents during the bid (tender) phase

D.

They are written instructions issued by the designer to the subtrades once the initial construction has begun

Buy Now
Question # 10

What rating is used to determine a material’s sound absorption?

Options:

A.

CAC

B.

STC

C.

NRC

D.

UL (CSA)

Buy Now
Question # 11

A designer has a contract with a client to provide complete contract documents for a tenant build-out. Specifying FF&E is beyond the scope of the contract. The designer makes some general FF&E recommendations to show a systems furniture layout as required by the local code officials. The furniture comes in over the client’s previously undisclosed budget. What should the designer do?

Options:

A.

Suggest that the client purchase directly from the manufacturer

B.

Meet with the client and furniture provider to resolve the problems

C.

Research alternate furniture options to bring the budget back in line

D.

Let the client and the furniture provider work out the budget problems

Buy Now
Question # 12

A contractor defaults on payments to a mechanical subcontractor. The subcontractor is protected and guaranteed payment by a

Options:

A.

payment bond

B.

mechanic’s lien

C.

performance bond

D.

builder’s risk insurance

Buy Now
Question # 13

Which characteristic of a water closet is MOST likely to impact the partition layout?

Options:

A.

Flow rate

B.

Carrier type

C.

Mounting height

D.

Flush valve finish

Buy Now
Exam Code: IDPX
Exam Name: Interior Design Professional Exam
Last Update: May 23, 2025
Questions: 175
IDPX pdf

IDPX PDF

$29.75  $84.99
IDPX Engine

IDPX Testing Engine

$33.25  $94.99
IDPX PDF + Engine

IDPX PDF + Testing Engine

$47.25  $134.99