Question # 44

Which of the following is NOT a product risk?

Options:

A.

Poor software usability

B.

Failure-prone software is delivered

C.

Problems in defining the right requirements

D.

Software does not perform the intended functions

Buy Now
Question # 45

An Incident Management tool implements the following defect states; Open, Assigned, Solved,

Closed Consider the following defect report:

Id T000561

Test Object "Warehouse Management' application

Tester name; John Bishop

Date: 10th. April 2010

Test Case MRT558I

Status OPEN

Severity Serious

Priority

Problem- After inputting the Total Quantity item = 450 in the SV034 screen, the system shows an unexpected Error message=47

Correction:

Developer name:

Closing date:

Which of the following is a valid criticism of this report?

Options:

A.

The Priority, the Correction description and the Developer name are missing

B.

The version of the application is missing

C.

There is no link to the applicable requirement (traceability)

D.

The description is not highlighting the source of the problem

Buy Now
Question # 46

A software development company invests heavily in tools to support the entire software development lifecycle, including testing. They have a tool that allows automated creation and installation of builds and subsequent execution of various types of automated tests. Which ONE of the following is a CORRECT statement about this type of test tool?

Options:

A.

It is an example of collaboration tool

B.

It is an example of test implementation tool

C.

It is an example of DevOps related tools

D.

It is an example of automated unit testing tool

Buy Now
Question # 47

The whole-team approach:

Options:

A.

promotes the idea that all team members should have a thorough understanding of test techniques

B.

is a consensus-based approach that engages the whole team in estimating the user stories

C.

promotes the idea that all team members should be responsible for the quality of the product

D.

is mostly adopted in projects aimed at developing safety-critical systems, as it ensures the highest level of testing independence

Buy Now
Question # 48

Which of the following is an example of black-box dynamic testing?

Options:

A.

Functional Testing

B.

Code inspection

C.

Checking memory leaks for a program by executing it

D.

Coverage analysis

Buy Now
Question # 49

Which ONE of the following options CANNOT be subjected to static analysis?

Options:

A.

COTS (Commercial off-the-shelf)

B.

Source code

C.

BPMN (Business Process Modeling and Notation) models

D.

UML (Unified Modeling Language) models

Buy Now
Question # 50

Consider the following list of possible benefits of retrospectives (A to D):

Options:

A.

Team bonding and learning

B.

Increased test effectiveness/efficiency

C.

Improved quality of the test basis

D.

Better cooperation between development and testing

... and the list of possible characteristics of retrospectives (1 to 4) that enable achieving these benefits:

The possibility of implementing suggestions for process improvement

The opportunity to raise problems and propose points for improvement

The regular review and optimization of the collaboration between team members

The possibility of addressing and solv

E.

A1 - B4 - C3 - D2

F.

A2 - B1 - C4 - D3

G.

A4 - B3 - C2 - D1

Buy Now
Question # 51

A class grade application for instructors assigns letter grades based on students' numerical grades.

The letter grades for different numerical grades should be:

Above 89, up to 100 - A

Above 79, up to 89 • B

Above 69, up to 79 • C

Above 59, up to 69 - D

Below 60- F

Which of the following sets of test inputs would achieve the relatively highest equivalence partition coverage?

Options:

A.

0, 58.59,70, 80

B.

74, 79.84,85, 89

C.

79, 89.90,99, 100

D.

69, 79. 80, 89, 90

Buy Now
Question # 52

A QA manager of a start-up company needs to implement within a week a low cost incident management tool. Which of the following is the best option?

Options:

A.

Document incidents on a large board in the lab

B.

Purchase and deploy an incident management tool

C.

Manage the incidents through E-mails and phone calls

D.

Manage the incidents in a spreadsheet posted on the intranet

Buy Now
Question # 53

Which ONE of the following options is a PRODUCT risk and NOT a PROJECT risk?

Options:

A.

Incorrect calculation logic in the software, leading to inaccurate results.

B.

Poor communication between team members, making project management more difficult.

C.

Staff shortages in the project leading to scheduling problems.

D.

Delays in the delivery of work products by the project team.

Buy Now
Exam Code: ISTQB-CTFL
Exam Name: ISTQB Certified Tester Foundation Level (CTFL v4.0)
Last Update: Sep 16, 2025
Questions: 361
ISTQB-CTFL pdf

ISTQB-CTFL PDF

$29.75  $84.99
ISTQB-CTFL Engine

ISTQB-CTFL Testing Engine

$33.25  $94.99
ISTQB-CTFL PDF + Engine

ISTQB-CTFL PDF + Testing Engine

$47.25  $134.99