Spring Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

M2 Exam Dumps - International Code Council Commercial Inspector Questions and Answers

Question # 14

Given: Fabricated of type 430 stainless steel.

Optional type _____ stainless steel is available.

Options:

A.

301

B.

303

C.

304

D.

316

Buy Now
Question # 15

An 8-inch Type B venting system with a listed vent cap must terminate a minimum of _____ feet above the flat roof through which it passes.

Options:

A.

1

B.

2

C.

4

D.

5

Buy Now
Question # 16

Supports for hazardous exhaust duct shall be constructed of:

Options:

A.

plastic.

B.

fibrous material.

C.

noncombustible material.

D.

material complying with UL 181.

Buy Now
Question # 17

To test for tightness, a consumer’s gas piping should never be filled with:

Options:

A.

air.

B.

dry air.

C.

oxygen.

D.

inert gas.

Buy Now
Question # 18

Why are two or more sets of construction documents, engineering calculations, diagrams, and other data required to be submitted with each application for a permit?

Options:

A.

To ensure that the project is completed in a timely manner.

B.

All sets are to be retained by the code official in order to have a spare set of construction documents for use by any subcontractors.

C.

All sets of documents are to be kept by the code official, and at least one set will serve as a backup set of documents in case the other is lost or misplaced.

D.

One set will be retained by the code official, and the other will be returned to the applicant and kept on the job site for reference while construction is in progress.

Buy Now
Exam Code: M2
Exam Name: Commercial Mechanical Inspector
Last Update: Apr 5, 2026
Questions: 50
M2 pdf

M2 PDF

$25.5  $84.99
M2 Engine

M2 Testing Engine

$28.5  $94.99
M2 PDF + Engine

M2 PDF + Testing Engine

$40.5  $134.99