Which interrogation option provides a pop-up window to choose the interrogated control’s HTML tags?
A developer working on an automation has added a diagnostic log component to check the following log file for information on inconsistent behavior.

Based on the image, which category and log level did the developer configure for the diagnostic log component in the automation?
Pega Robot Studio produces several log files during the opening, building, debugging, and deployment of a solution.
In the Answer Area, drag the description of the log file on the left to its correct log file name.

When developing automations and robotic projects for use with Pega applications, there are recommended design specifics and considerations for the developer. Of the options below, which three are recommended developer considerations? (Choose Three)
A service request manager, who responds to 1000 active service tickets per week, receives a ticket for new account creation. This ticket has been marked as the highest priority and contains all the necessary details for an account creation.
The manager creates an activity and assigns all the context values with appropriate values.
Which two activity methods of the account creation ticket can be used to close the ticket within priority? (Choose two.)
During project testing, an issue requires you to add a diagnostic log component to track the log files to help determine a resolution. After testing, you decide not to remove the diagnostic log component from the automation and decide to simply turn off the log component.
Which diagnostic log component setting allows you to turn the logging component off temporarily?
While preparing for packaging and deployment, you decide to remove all remaining breakpoints from the automations in each project.
Which two ways can you delete automation breakpoints? (Choose Two)
The variable varInput is a String that holds the value What is the output?

What is the outcome of the above automation?
An Insurance Call Center project requires the use of the Interaction Framework. The supporting applications should perform specific work when processing claims. The claim requires the claim number and the claim date, but it may also share other claim information in the interaction’s context values.
Based on the information, which interaction.xml activity entry configures the project requirements?

