A wireless engineer is performing a post verification of a wireless network. Which two metrics does the engineer verify to ensure that the wireless network can support voice services? (Choose two.)
A wireless engineer is utilizing the voice readiness tool in Cisco Prime for a customer that wants to deploy Cisco IP phones. Which dBm range is the network inspected against?
An engineer is designing a solution where guests terminate on an anchor controller in the DMZ. The engineer is having issues and wants to test connectivity between members of a mobility group. Which command must be issued to test whether a mobility control packet is able to be reached over the management interface?
Which two statements are correct about 5 GHz WLAN compared to 2.4 GHz? (Choose two.)
A wireless consultant reviewing the installation of an old wireless network. The existing AireOS controllers are running software version 6.0.4539:44024. The customer is using OEAP and wants to keep this functionality. Which licenses should the consultant propose with the latest controller software version?
A customer celled with a requirement that internal clients must be on different subnets depending on the building they are in, AH access points are operating in local mode and will not be modified, and this is a single controller solution. Which design approach creates the desired result?
An engineer is designing an outdoor mesh network to cover several sports fields. The core of the network is located in a building at the entrance of a sports complex. Which type of antenna should be used with the RAP for backhaul connectivity?
A university has three campus locations and the main data center. Each campus location has a Cisco Catalyst 9800-40 WLC that manages 600 APs The data center has a Catalyst 9800-40 WLC, which serves as an N+1 backup for each campus WLC. A consulting engineer must install four additional Catalyst 9800-40 WLCs to serve as the high availability SSO pair for each campus, but only two have been approved due to budget restrictions. The new WLCs must be implemented using these requirements
• Data center WLC must always be available as N+1 backup to either campus WLC.
• Campus1 WLC must operate with zero downtime.
• In the event of multiple campus outages, the AP priority order is to support Campus3, Campus2. and then Campus1
• No APs on campus can be left stranded without a WLC in the event of an outage.
What design approach must the consulting engineer take?
Refer to the exhibit.

An engineer is about to establish a mobility peer connection between a Cisco Catalyst 9800-CL version 16.10.1e and Cisco AireOS 5520 version 8.8.120.0. The data path between the 9800-CL and AireOS 5520 is down, but its control path is up. Based on the configuration, what is the cause of the issue?