Labour Day Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bigdisc65

350-501 Exam Questions Tutorials

Page: 7 / 33
Question 28

Refer to the exhibit:

An engineer is preparing to implement link aggregation configuration.

Which statement al about this configuration is true?

Options:

A.

The switch port actively sends packets to negotiate an EtherChannel using PAgP

B.

The switch port accepts LACP and PAgP packets from a connected peer and negotiate an EtherChannel using the common EtherChannel mode.

C.

The switch port passively negotiates an EtherChannel if it receives PAgP packets from a connected peer

D.

The switch port negotiates an EtherChannel if it receives LACP packets from a connected peer

Question 29

Refer to the exhibit. Router BRDR-1 is configured to receive the 0.0.0.0/0 and 172.17.1.0/24 network via BGP and advertise then into OSPF area 0. An engineer has noticed that the OSPF domain is receiving only the 172.17.1.0/24 route and default router 0.0.0.0/0 is still missing. Which configuration must an engineer apply to resolve this problem?

  • uk.co.certification.simulator.questionpool.PList@1db5edb0

  • uk.co.certification.simulator.questionpool.PList@1db5edf0

  • uk.co.certification.simulator.questionpool.PList@1db5ee30

Options:

A.

Option D

Question 30

In an EVPN operation, how does the PE determine and advertise Ethernet segment reachability?

Options:

A.

The PE discovers the remote PEs in the EVI and builds a flood list linked with the EVI.

B.

The PE discovers and shared routing information for the B-MAC addresses associated with local Ethernet segments.

C.

The PE discovers other PEs in the same Ethernet segment and elects a DF.

D.

The PE discovers remote ESIs and determines their redundancy mode.

Question 31

An ISP Is Implementing end-to-end fault monitoring for a customer based on the IEEE 802.3ah standard. The solution must detect when 15 or more corrupted Ethernet packets arrive within 10 ms and stop propagating traffic through the ISP backbone network or to the customer side. Which configuration must the ISP engineer apply?

Options:

A.

ethernet oam link-monitoring enable

ethernet oam link-monitor crc-errors ingress time-window 10

ethernet oam link-monitor crc-errors ingress threshold high 15 ethernet oam link-monitor crc-errors egress time-window 10 ethernet oam link-monitor crc-errors egress threshold high 15 ethernet oam link-monitor high-threshold action shutdown-interface

B.

ethernet oam link-monitoring

ethernet oam link-monitor receive-crc window 15

ethernet oam link-monitor receive-crc threshold high 10

ethernet oam link-monitor high-threshold action disable-interface

C.

ethernet oam

ethernet oam link-monitor receive-crc window 10

ethernet oam link-monitor receive-crc threshold high 15

ethernet oam link-monitor transmit-crc window 10

ethernet oam link-monitor transmit-crc threshold high 15

ethernet oam link-monitor high-threshold action errordisable-interface

D.

ethernet oam link-monitoring global enable

ethernet oam link-monitor receive crc-errors period 15

ethernet oam link-monitor receive crc-errors limit 15

ethernet oam link-monitor transmit crc-errors period 10

ethernet oam link-monitor transmit crc-errors limit 15

ethernet oam link-monitor limit action error-disable interface

Page: 7 / 33
Exam Code: 350-501
Exam Name: Implementing and Operating Cisco Service Provider Network Core Technologies (SPCOR)
Last Update: May 6, 2024
Questions: 452
350-501 pdf

350-501 PDF

$31.5  $90
350-501 Engine

350-501 Testing Engine

$36.75  $105
350-501 PDF + Engine

350-501 PDF + Testing Engine

$49  $140