Summer Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bigdisc65

Download Full Version DU0-001 APC Exam

Page: 2 / 11
Question 8

Tracking achievement against agreed upon service levels is an example of which specific management process?

Options:

A.

Planned down time

B.

Infrastructure improvement

C.

Availability metrics reporting

D.

Advanced warning for failure

Question 9

What is the purpose of the alternator as a primary component of a standby generator?

Options:

A.

Starts the prime mover upon loss of utility power

B.

Controls output voltage reference produced by the prime mover

C.

Converts mechanical energy from the prime mover into electrical current

D.

Maintains constant RPM of the prime mover under a variety of conditions by adjusting the fuel that feeds the prime mover

Question 10

Chilled water produced by a chiller is typically within which temperature range?

Options:

A.

34 - 38 F (1 - 3 C)

B.

44 - 48 F (6 - 9 C)

C.

56 - 60 F (13 - 16 C)

D.

70 - 74 F (21 - 23 C)

Question 11

What are two advantages of the line interactive UPS? (Choose two.)

Options:

A.

High reliability

B.

High efficiency

C.

High frequency control

D.

Optimized for 10 kW and above

Page: 2 / 11
Exam Code: DU0-001
Exam Name: Data Center University Associate Certification
Last Update: May 19, 2024
Questions: 324
DU0-001 pdf

DU0-001 PDF

$28  $80
DU0-001 Engine

DU0-001 Testing Engine

$33.25  $95
DU0-001 PDF + Engine

DU0-001 PDF + Testing Engine

$45.5  $130