Question 96

A project manager identified a risk in a geographically unstable area. During the project, a volcano erupts, preventing project team access. Which of the following documents should the project manager update FIRST?

Options:

A.

Project schedule

B.

Issue log

C.

Risk register

D.

Scope statement

Question 97

Which of the following normally would be completed prior to a vendor responding to an RFP?

Options:

A.

PO

B.

Contract

C.

SLA

D.

NDA

Question 98

In a projectized organization, a project manager has a need for a testing resource. The first place the project

manager should look for this resource is:

Options:

A.

a dedicated resource pool

B.

an allocated resource pool

C.

a shared resource pool

D.

a benched resource pool

Question 99

Some resources are waiting to be assigned to a new project. These resources are called:

Options:

A.

underqualified resources.

B.

benched resources.

C.

dedicated resources.

D.

overallocated resources.

Page: 24 / 29
Exam Code: PK0-004
Exam Name: CompTIA Project+ Exam
Last Update: Apr 25, 2024
Questions: 796
PK0-004 pdf

PK0-004 PDF

$28  $80
PK0-004 Engine

PK0-004 Testing Engine

$33.25  $95
PK0-004 PDF + Engine

PK0-004 PDF + Testing Engine

$45.5  $130