Weekend Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bigdisc65

Exactprep CTFL-Foundation Questions

Page: 10 / 11
Question 40

Which of the following would be the most significant input to estimating the time to carry out the specified testing tasks? 3 credits

Options:

A.

The skills and experience of developers to correct the failures.

B.

The standards used for the requirements specification.

C.

The metrics recorded from testing the capture-replay tool.

D.

The number of testers in the company and their grade.

Question 41

Which of the following would you expect to see in the master test plan? 1 credit

Options:

A.

A description of how the test cases are cross-referenced to requirements in the test management tool.

B.

A detailed identification of the resources that will carry out structural testing in the first iteration.

C.

The test approach that will be applied at system integration testing.

D.

A list of the names of the testers who will carry out the performance testing for the final iteration.

Question 42

Which of the following would be the TWO most appropriate examples of entry criteria documented in the system integration test plan? 2 credits

Options:

A.

The percentage of decision coverage achieved during unit testing.

B.

The availability of the latest version of the capture-replay tool (for testing the interface with the newly developed test management tool).

C.

The sign-off of a performance test software release note (test item transmittal report) by both development and testing showing that system performance meets the specified acceptance criteria.

D.

The percentage of acceptance test procedures scheduled for execution.

E.

The percentage of requirements coverage achieved during system integration test.

Question 43

As part of the test strategy, entry and exit criteria will be defined for each test level. Which is NOT a valid reason for using entry and exit criteria? 1 credit

Options:

A.

The expectation is that development testing is not adequate.

B.

Exit criteria are used to decide on when to stop testing.

C.

Entry and exit criteria are a principal way for getting adequate resources.

D.

Using entry and exit criteria will prevent software that is not or poorly tested from going to the next test level.

Page: 10 / 11
Exam Code: CTFL-Foundation
Exam Name: ISTQB Certified Tester Foundation Level
Last Update: May 19, 2024
Questions: 332
CTFL-Foundation pdf

CTFL-Foundation PDF

$28  $80
CTFL-Foundation Engine

CTFL-Foundation Testing Engine

$33.25  $95
CTFL-Foundation PDF + Engine

CTFL-Foundation PDF + Testing Engine

$45.5  $130