Labour Day Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bigdisc65

HP Certification HPE0-V27 Release Date

Page: 3 / 5
Question 12

Your customer is considering a new HPE Alletra 9060 to service their mission critical database workloads.

Their CFO is concerned with the cost of the unused excess storage capacity that will service unforeseen future growth.

What business values does HPE GreenLake for Block Storage provide that could alleviate this concern?

Options:

A.

It offers CapEx purchases so the client can depreciate the storage assets.

B.

It sets the minimum capacity commitment level to the required capacity.

C.

It provides storage capacity on an as-needed basis at a predetermined cost per GB.

D.

It provides a fixed monthly cost, regardless of the storage consumption.

Question 13

Which protocol should you recommend for a dedicated lossless fabric?

Options:

A.

Internet SCSI

B.

Fibre Channel (FCP)

C.

Fibre Channel over Ethernet (FCoE)

D.

Fibre Channel over IP (FCIP)

Question 14

Which components are part of HPE GreenLake Data Protection. (Choose two.)

Options:

A.

Application mobility

B.

Disaster recovery

C.

Azure blob backup

D.

CSI plugin

E.

Object gateway

Question 15

Your customer has the following concerns about your dHCI proposal:

The extended lead times for some parts of the solution do not meet their Project timelines.

They do not have sufficient IT resources to deploy a new solution.

They are struggling with the initial cost outlay.

Which solution addresses all three of their concerns?

Options:

A.

Use the HPE TCO and ROI calculator to develop a compelling business case that highlights the value proposition as well as essential financial metrics that are important to the customers.

B.

Use the HPE Assessment Foundry to find ways to lower the amount of storage needed. Use the results of the reports to use cheaper drives in the storage array. Also HPE Pointnext services for installation.

C.

Rebuild the solution in OCA, and look for opportunities in the tool to replace long lead time components with similar components that have shorter lead times. Also with your sales team to revise the cost of the solution to meet customer needs.

D.

Rebuild your solution using the HPE GreenLake Quick Quote tool. With HPE GreenLake, the solution can be delivered in as little as 14 days, GreenLake solution deployed by HPE, and the solution is billed monthly.

Page: 3 / 5
Exam Code: HPE0-V27
Exam Name: HPE Edge-to-Cloud Solutions
Last Update: Apr 25, 2024
Questions: 74
HPE0-V27 pdf

HPE0-V27 PDF

$28  $80
HPE0-V27 Engine

HPE0-V27 Testing Engine

$33.25  $95
HPE0-V27 PDF + Engine

HPE0-V27 PDF + Testing Engine

$45.5  $130