A Dispatcher at Universal Containers has just been informed that one of their field employees, who has five servicesschedules for today, called in sick. How should the workload be assigned to other Field Technicians?
A mobile technician uses parts present in their van to complete an on-site customer installation. The technician has marked theservice appointment and work order as completed. They want to record the parts used in completing the job and adjust their van stock.
Where should the technician record this information?
Each door lock that Universal Containers (UC)sells has a unique 20 digit code. The code represents the manufacturer, production run, and production number.
UC needs to track each lock. In addition to the installed locks, all Technicians carry five replacement units in their van stock,
How should UC track the van stock door locks?
Service Appointments in a "Cannot Complete" status may indicate that an additional part or expert assistance is needed to complete the work. Universal Containers defined that Service Appointments in a "Cannot Complete" status are unable to be rescheduled or unscheduled for history tracking purposes.
Which two items should the Consultant recommerd to meet the requirement?
Choose 2 answers
Universal Containers wants to ensure that Service Appointments are only assigned toActive Resources.
Which configuration should a Consultant recommend for the Scheduling Policy?
Optimization for the Midwest territory is set to automatically run each night for the next three days. The Dispatcher has noticed that the optimizer is leaving many
Service Appointments unscheduled and has asked the Consultant to troubleshoot the issue. The Consultant notices that the Optimization Run Time per Service
Appointment is set to Low in the Field Service Settings.
Which two conditions would make the Consultant consider setting the optimizer to High? Choose 2? answers
Which two objects are required when configuring an optimization job? Choose 2? answers
Each container consists of multiple parts that are tracked by Asset records. Universal Containers’s customers usually wait until several parts need service before requesting a Technician come on-site to save money on servicecharges.
How should a Consultant configure Salesforce Field
Service to track the work performed?