Weekend Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bigdisc65

ISO-IEC-42001-Lead-Auditor Exam Dumps - PECB AI management system (AIMS) Questions and Answers

Question # 14

During which phase of the certification process is confirmation of registration performed?

Options:

A.

Before the initial audit

B.

During the initial audit

C.

Beyond the initial audit

Buy Now
Question # 15

Question:

What is a significant drawback of using judgment-based sampling in audits?

Options:

A.

It requires extensive statistical training for the audit team

B.

It does not allow for a statistical estimate of uncertainty in the audit findings

C.

It relies mostly on previously identified significant risks

Buy Now
Question # 16

Scenario 3: Heala specializes in developing AI-driven solutions for the healthcare sector. With a keen focus on leveraging AI to revolutionize patient care, diagnostics, and treatment planning, the company has implemented an Artificial Intelligence Management System (AIMS) based on ISO/IEC 42001. After a year of having the AIMS in place, the company decided to apply for a certification audit.

It contracted a local certification body, which established the audit team and assigned the audit team leader. Augustine, the designated audit team leader, has a wide range of skills relevant to various auditing domains. His proficiency encompasses audit principles, processes, and methods, as well as standards for management systems and additional references. Furthermore, he is knowledgeable about Heala’s context and relevant statutory and regulatory requirements.

Augustine first gathered management review records, interested party feedback logs, and revision histories for Heala's AIMS. This crucial step laid the groundwork for a deeper investigation, which included conducting comprehensive interviews with key personnel to understand how feedback from interested parties directly influenced updates to the AIMS and its strategic direction. Augustine's thorough evaluation process aimed to verify Heala's commitment to integrating the needs and expectations of interested parties, a critical requirement of ISO/IEC 42001.

Augustine also integrated a sophisticated AI tool to analyze large datasets for patterns and anomalies and thus have a more informed and data-driven audit process. This AI solution, known for its ability to sift through vast amounts of data with unparalleled speed and accuracy, enabled Augustine to identify irregularities and trends that would have been nearly impossible to detect through manual methods. The tool was also helpful in preparing hypotheses based on data.

During the audit, Augustine failed to fully consider Heala’s critical processes, expectations, the complexity of audit tasks, and necessary resources beforehand. This oversight compromised the audit’s integrity and reliability, reflecting a significant deviation from the diligence and informed judgment expected of auditors.

According to Scenario 3, Augustine conducted interviews with key personnel to understand how interested party feedback influenced updates to the AIMS. What type of audit evidence did Augustine collect?

Options:

A.

Verbal

B.

Technical

C.

Analytical

Buy Now
Question # 17

Which statement regarding the confidentiality of documented information related to or collected from the auditee is NOT accurate?

Options:

A.

The certification body notifies the auditee before disclosing information, considering all types of information as confidential unless already public

B.

Confidential information related to the auditee's AIMS can be disclosed without prior notice if legally required or contractually authorized

C.

Information from external sources, like regulators or complaints, is automatically public and can be disclosed without restriction

D.

Auditors and certification bodies must protect the confidentiality of auditee information unless legal or contractual disclosure is required

Buy Now
Question # 18

Scenario 3:

ArBank is a financial institution located in Brussels, Belgium, which offers a diverse range of banking and investment services to its clients. To ensure the continual improvement of its operations, ArBank has implemented a quality management system QMS based

on ISO 9001 and an artificial intelligence management system AIMS based on the requirements of ISO/IEC 42001.

Audrey, an experienced auditor, led an internal audit focused on the AIMS within ArBank. She assessed the chatbots integrated into the bank's website and mobile app, analyzing communications using big data technology to identify potential noncompliance, fraud, or unethical conduct. Instead of relying solely on the information provided by the chatbots, Audrey sought out evidence that would either confirm or challenge the validity of the data, ensuring her conclusions were based on reliable and accurate information. Her review of selected chatbot interactions confirmed they met their intended purpose.

For the specific context of ArBank's operations, Audrey utilized an Al system to assess the efficiency of the bank's digital infrastructure, focusing on tasks critical to the Finance Department. This Al system was able to analyze the functionality of chatbots integrated into ArBank's website and mobile app to determine if it adheres to ISO/IEC 42001 requirements and internal policies governing customer service in the banking sector.

In addition, Audrey conducted a deeper assessment of the bank’s AIMS. Her evaluation included observing different stages of the AIMS life cycle, from development to deployment, to ensure that roles and responsibilities were clearly defined and aligned with ArBank’s operational goals. She also evaluated the tools used to monitor and measure the performance of the AIMS.

Audrey continued the audit process by auditing ArBank's outsourced operations. Upon checking the contractual agreements between the two parties, Audrey decided that there was no need to gather audit evidence regarding the contractual agreement. She reviewed the company's processes for monitoring the quality of outsourced operations, determined whether appropriate governance processes are in place with regard to the engagement of outsourced persons or organizations, and reviewed and evaluated the company's plans in case of expected or unexpected termination of the outsourcing agreement.

Based on the scenario above, answer the following question:

Question:

Which audit principle did Audrey demonstrate while assessing the chatbots?

Options:

A.

Risk-based approach

B.

Confidentiality

C.

Due professional care

D.

Impartiality

Buy Now
Question # 19

A financial institution has integrated AI systems into its operations and has adopted risk management principles from an internationally recognized standard to specifically mitigate AI-related risks effectively. Which standard has the institution applied in this case?

Options:

A.

ISO 31000

B.

ISO/IEC 27005

C.

ISO/IEC 23895

Buy Now
Question # 20

Which of the following statements regarding the interested parties related to the AIMS is correct?

Options:

A.

Applicable interested parties may have expectations related to climate change initiatives

B.

Internal parties can include regulators and legislators

C.

The specific needs and expectations of interested parties to be addressed through the AIMS are determined by organizational discretion

Buy Now
Question # 21

What is the purpose of conducting an opening meeting in the audit process?

Options:

A.

To discuss the audit findings

B.

To establish the audit criteria

C.

To confirm the audit plan and address any issues

D.

To perform a root cause analysis

Buy Now
Question # 22

Question:

A certification body is conducting surveillance audits for a company managing multiple sites, including a temporary construction site with a limited duration.

The audit team is considering whether the presence of this temporary site should influence the frequency of surveillance audits.

Can this factor necessitate an adjustment in the audit schedule?

Options:

A.

Yes, because it represents a management system certification of limited duration

B.

No, temporary construction sites do not influence audit frequency

C.

Yes, but only if the construction site operates under different seasonal conditions

Buy Now
Question # 23

Question:

A software development company values collaborative decision-making. The CEO often gathers input from employees but retains final decision authority.

Which type of leadership does the CEO most closely embody?

Options:

A.

Autocratic

B.

Laissez-faire

C.

Democratic

Buy Now
Exam Name: ISO/IEC 42001:2023 Artificial Intelligence Management System Lead Auditor Exam
Last Update: Aug 17, 2025
Questions: 198
ISO-IEC-42001-Lead-Auditor pdf

ISO-IEC-42001-Lead-Auditor PDF

$29.75  $84.99
ISO-IEC-42001-Lead-Auditor Engine

ISO-IEC-42001-Lead-Auditor Testing Engine

$33.25  $94.99
ISO-IEC-42001-Lead-Auditor PDF + Engine

ISO-IEC-42001-Lead-Auditor PDF + Testing Engine

$47.25  $134.99