Question # 19

Which of the following steps of the troubleshooting methodology would most likely involve comparing current throughput tests to a baseline?

Options:

A.

Implement the solution

B.

Verify full system functionality

C.

Document findings

D.

Test the theory

Buy Now
Question # 20

A network administrator wants to restrict inbound traffic to allow only HTTPS to the company website, denying all other inbound traffic from the internet. Which of the following would best accomplish this goal?

Options:

A.

ACL on the edge firewall

B.

Port security on an access switch

C.

Content filtering on a web gateway

D.

URL filtering on an outbound proxy

Buy Now
Question # 21

A network engineer is completing a new VoIP installation, but the phones cannot find the TFTP server to download the configuration files. Which of the following DHCP features would help the phone reach the TFTP server?

Options:

A.

Exclusions

B.

Lease time

C.

Options

D.

Scope

Buy Now
Question # 22

A user tries to visit a website, but instead of the intended site, the page displays vmw.cba.com. Which of the following should be done to reach the correct website?

Options:

A.

Modify the CNAME record

B.

Update the PTR record

C.

Change the NTP settings

D.

Delete the TXT record

Buy Now
Question # 23

Which of the following is a cost-effective advantage of a split-tunnel VPN?

Options:

A.

Web traffic is filtered through a web filter.

B.

More bandwidth is required on the company’s internet connection.

C.

Monitoring detects insecure machines on the company’s network.

D.

Cloud-based traffic flows outside of the company’s network.

Buy Now
Question # 24

A network engineer configures an application server so that it automatically adjusts resource allocation as demand changes. This server will host a new application and demand is not predictable. Which of the following concepts does this scenario demonstrate?

Options:

A.

Scalability

B.

Software as a Service

C.

Hybrid cloud

D.

Elasticity

Buy Now
Question # 25

A network technician is troubleshooting network latency and has determined the issue to be occuring two network switches( Switch10 and Switch11). Symptoms reported included poor video performance and slow file copying. Given the following informtion:

Which of the following should the technician most likely do to resolve the issue?

Options:

A.

Disable automatic negotiation on Switch11.

B.

Modify Switch10 MTU value to 1500.

C.

Configure STP on both switches.

D.

Change the native VLAN on the ports.

Buy Now
Question # 26

Users usually use RDP to connect to a terminal server with hostname TS19 that points to 10.0.100.19. However, users recently have been unable to connect to TS19. The technician pings 10.0.100.19 and gets an unreachable error. Which of the following is the most likely cause?

Options:

A.

The users are on the wrong subnet.

B.

The DHCP server renewed the lease.

C.

The IP address was not reserved.

D.

The hostname was changed.

Buy Now
Question # 27

A network engineer is setting up a new VoIP network for a customer. The current network is segmented only for computers and servers. No additional switch ports can be used in the new network. Which of the following does the engineer need to do to configure the network correctly? (Select TWO).

Options:

A.

Change network translation definitions

B.

Enable 802.1Q

C.

Implement a routing protocol

D.

Set up voice VLANs

E.

Reconfigure the DNS

F.

Place devices in the perimeter network

Buy Now
Question # 28

A technician is troubleshooting a computer issue for a user who works in a new annex of an office building. The user is reporting slow speeds and intermittent connectivity. The computer is connected via a Cat 6 cable to a distribution switch that is 492ft (150m) away. Which of the following should the technician implement to correct the issue?

Options:

A.

Increase the bandwidth allocation to the computer.

B.

Install an access switch in the annex and run fiber to the distribution switch.

C.

Run a Cat 7 cable from the computer to the distribution switch.

D.

Enable the computer to support jumbo frames.

Buy Now
Question # 29

Which of the following steps in the troubleshooting methodology would be next after putting preventive measures in place?

Options:

A.

Implement the solution.

B.

Verify system functionality.

C.

Establish a plan of action.

D.

Test the theory to determine cause.

Buy Now
Question # 30

Which of the following is the MOST appropriate solution to extend the network to a building located across the street from the main facility?

Options:

A.

Multimode fiber

B.

802.11ac wireless bridge

C.

Cat 6 copper

D.

Loopback adapter

Buy Now
Question # 31

Which of the following is the most cost-effective way to safely expand outlet capacity in an IDF?

Options:

A.

PDU

B.

Surge protector

C.

UPS

D.

Power strip

Buy Now
Question # 32

Which of the following Layer 1 devices is responsible for the termination of fiber-optic connections on an SFP-capable switch?

Options:

A.

Transceiver

B.

Modem

C.

Ethernet NIC

D.

Repeater

Buy Now
Question # 33

Which of the following best describes the purpose of a UPS and PDU in a network installation?

Options:

A.

To support voltage requirements for devices in an IDF

B.

To manage power consumption in the MDF

C.

To connect multiple devices to a single network connection

D.

To regulate temperature in the MDF and IDF

Buy Now
Exam Code: N10-009
Exam Name: CompTIA Network+ Certification Exam
Last Update: Jun 16, 2026
Questions: 550
N10-009 pdf

N10-009 PDF

$25.5  $84.99
N10-009 Engine

N10-009 Testing Engine

$28.5  $94.99
N10-009 PDF + Engine

N10-009 PDF + Testing Engine

$40.5  $134.99