Labour Day Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bigdisc65

Complete CPIM-8.0 APICS Materials

Page: 5 / 11
Question 20

A company assembles kits of hand tools after receipt of the order from distributors and uses two-level master scheduling. The appropriate levels of detail for the forecasts that are input to master scheduling would be total number of kits and:

Options:

A.

each unique tool.

B.

percentage of total for each tool.

C.

raw material requirements.

D.

specific kit configurations.

Question 21

It takes an average of 3 hours to set up a model and 1 hour to run, but depending on the complexity of the models, the setup time can be significantly different. Last week. 2 modelers were working on different projects. Each worked 40 hours. One modeler finished 5 models a day, and the other finished 1 model a day. What was the demonstrated capacity last week?

Options:

A.

25models

B.

15models

C.

10models

D.

30models

Question 22

The cost accountant has discovered a consistent overage in actual run time for one operation. This information should be sent first to the:

Options:

A.

product manager to increase the selling price of the product.

B.

quality manager to add a new quality measurement to the operation.

C.

production supervisor to review and explain the overage.

D.

the engineering manager to evaluate the run time for the routing.

Question 23

Which of the following conditions is most likely to result in planned production that is greater than the total demand over the sales and operations planning (S&OP) horizon for a product family that is

made to stock?

Options:

A.

An increase in the customer service level is planned for the product family.

B.

New models are being added to the product family.

C.

Planned ending inventory for the product family is less than the beginning inventory.

D.

There is a long-term upward trend in demand for the product family.

Page: 5 / 11
Exam Code: CPIM-8.0
Exam Name: Certified in Planning and Inventory Management (CPIM 8.0)
Last Update: May 7, 2024
Questions: 150
CPIM-8.0 pdf

CPIM-8.0 PDF

$28  $80
CPIM-8.0 Engine

CPIM-8.0 Testing Engine

$33.25  $95
CPIM-8.0 PDF + Engine

CPIM-8.0 PDF + Testing Engine

$45.5  $130