Weekend Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bigdisc65

H35-460 Exam Questions Tutorials

Page: 3 / 7
Question 12

What data configuration tools can gNodeb use to complete the site opening?

Options:

A.

CME

B.

US

C.

LMT

D.

MaOS

Question 13

Which of the following signals reflects the coverage of the NR network uplink?

Options:

A.

PDCCH DMRS

B.

PBCH DMRS

C.

SRS

D.

CSI-RS

Question 14

If the main control board UMPT uses a 10Gbps optical module when the NR base station is turned on, the ETHPORT of GTRANSPARA must be configured to 10Gbps and cannot be configured to slow down.

Options:

A.

Correct

B.

Errors

Question 15

Regarding the DMRS of the PDSCH, what are the correct descriptions of the following? (Multiple Choice)

Options:

A.

Divided into pre-DMRS and additional DMRS, pre-DMRS is mainly used in high-speed scenes

B.

The maximum number of ports supported by Type2 is 12

C.

The maximum number of ports supported by Type1 is 8

D.

It is divided into two types, Type1 and Type2, and the maximum number of ports supported is different

Page: 3 / 7
Exam Code: H35-460
Exam Name: HCS-5G RAN V1.0
Last Update: May 15, 2024
Questions: 218
H35-460 pdf

H35-460 PDF

$28  $80
H35-460 Engine

H35-460 Testing Engine

$33.25  $95
H35-460 PDF + Engine

H35-460 PDF + Testing Engine

$45.5  $130