A large enterprise has a main campus with two 8-Node vSAN 7.0 U1 clusters and 50 remote sites, each containing one 2-Node cluster. An administrator configures a vLCM desired image for lifecycle management, and vLCM had determined that all the clusters are in need of remediation.
How would vLCM enhance the remediation operation in this situation?
An administrator is responsible for managing a 5-node vSAN 7.0 cluster. The vSAN Cluster is configured with both vSphere High Availability (HA) and vSphere Distributed Resource Scheduler (DRS). The vSAN Cluster is currently hosting 150 virtual machines that have consumed 60% of the usable capacity.
Each virtual machine belongs to one of the following vSAN Storage Policies:
vSANPolicy1:
• Site Disaster Tolerance: None
• Failures to Tolerate: 1 failure - RAID5 (Erasure Coding)
vSANPolicy2:
• Site Disaster Tolerance: None
• Failures to Tolerate: No data redundancy
Following an unplanned power event within the data center, the administrator has been alerted to the fact that one host has permanently failed.
What will be the impact to any virtual machine that was running on the failed host using vSANPolicy1?
A vSAN administrator wants to transition from VMware Update Manager to vSphere Lifecycle Manager.
Which element is a mandatory requirement to create an image?
A vSAN administrator was presented with 30 additional vSAN ReadyNodes to add to an existing vSAN cluster. There is only one administrator to complete this task.
What is the fastest approach?