Weekend Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bigdisc65

Selected CQE ASQ certification Questions Answers

Page: 2 / 5
Question 8

Which of the following is NOT considered a prevention cost?

Options:

A.

Writing operating procedures.

B.

Training.

C.

Data acquisition and analysis.

D.

Calibrating test equipment.

Question 9

A quality control program is considered to be

Options:

A.

A collection of quality control procedures and guidelines.

B.

A step by step listing of all quality control check points.

C.

A summary of company quality control policies.

D.

A system of activities to provide quality of products and service.

Question 10

A company is planning to completely change its employee performance, appraisal and reward system. Which of the following is NOT viable for consideration in the new system?

Options:

A.

Integrating subordinate, peer, customer, and self-evaluations with supervisory ratings.

B.

Using continuous improvement, quality and customer satisfaction as key criteria.

C.

Requiring work team or group evaluations that are equal in emphasis to individual evaluations.

D.

Requiring less frequent performance reviews, but utilizing many rating categories.

Question 11

Benchmarking might be defined as any of the following EXCEPT:

Options:

A.

A process for rigorously measuring your performance versus the best-in-class companies.

B.

A standard of excellence or achievement against which other similar things must be measured orjudged.

C.

Comparing the performance of one company to a set of standards and then to another'sperformance.

D.

The search for best industry practices that lead to superior performance.

Page: 2 / 5
Exam Code: CQE
Exam Name: Certified Quality Engineer
Last Update: May 16, 2024
Questions: 160
CQE pdf

CQE PDF

$28  $80
CQE Engine

CQE Testing Engine

$33.25  $95
CQE PDF + Engine

CQE PDF + Testing Engine

$45.5  $130