Spring Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

FlashArray-Implementation-Specialist Exam Dumps - Pure Storage FAIS Questions and Answers

Question # 34

An Implementation Engineer is scheduled to install a FlashArray and a DirectFlash Shelf (DFS). What action should the Implementation Engineer perform?

Options:

A.

Refer to the “Recommended DFS Versions for Purity Releases” KB and upgrade Purity on the FlashArray and DFS.

B.

Install the Array and DFS with the Purity that shipped and have Support upgrade remotely.

C.

Only upgrade the Purity on the FlashArray and then attach the DFS.

Buy Now
Question # 35

After rebooting a controller, which command should an Implementation Engineer run to verify all the Purity services have started successfully?

Options:

A.

pureadm status --all

B.

pureadm list --status

C.

pureadm list

D.

purecluster status

Buy Now
Question # 36

A customer wants to expand the capacity of their FlashArray//X10 from 5/5 to 11/11. Which is the correct action to take?

Options:

A.

Evacuate and swap one pack at a time.

B.

Perform a drive-by-drive swap of the modules.

C.

Install a swing shelf with loan capacity to evacuate to.

Buy Now
Question # 37

An Implementation Engineer is setting up a customer environment and has specified a number of NTP servers. Which command should the Implementation Engineer run to list the NTP servers that have been configured?

Options:

A.

puredns list --ntpserver

B.

purenetwork list --ntpserver

C.

purearray list --ntpserver

Buy Now
Question # 38

Before leaving the site after an install, who is required to provide completion sign-off?

Options:

A.

Account team

B.

Customer

C.

Support

Buy Now
Question # 39

What is the minimum AC voltage required to operate a FlashArray//X20R4 array?

Options:

A.

90

B.

180

C.

220

Buy Now
Question # 40

An Implementation Engineer attempts to add a FlashArray to a Fusion fleet but receives an error indicating the array cannot be added. The array appears healthy and is connected to Pure1.

What is the most likely cause of this issue?

Options:

A.

The array is already assigned to another Fusion fleet.

B.

The array does NOT have any existing workloads configured.

C.

The array is NOT running the latest Purity//FA version.

D.

The array's management interface is physically disconnected.

Buy Now
Question # 41

What command should the Implementation Engineer run to configure a proxy?

Options:

A.

puresetup proxy https://yourproxyserver:1234

B.

purearray setattr --proxy https://yourproxyserver:1234

C.

purearray configure --proxy url https://example.proxy.server

Buy Now
Question # 42

What is the speed of the Ethernet ports to connect a FlashArray //E to a DFS?

Options:

A.

40G

B.

25G

C.

100G

Buy Now
Question # 43

A customer has a DirectFlash Shelf installed on a FlashArray//X90R4. The 208V rack PDUs are full, but there are five 120V connections available at the top of the rack.

What should the Implementation Engineer understand about powering the DirectFlash Shelf in this scenario?

Options:

A.

The shelf can be fully supported by 120V for the duration of its service life.

B.

The shelf can operate temporarily on 120V, but 208/240V should be used as soon as it's available.

C.

The shelf requires at least 180V to operate and will NOT power on with 120V.

D.

The shelf will operate on 120V but with severely degraded NVMe-oF performance.

Buy Now
Exam Name: Pure Certified FlashArray Implementation Specialist (FAIS) Exam
Last Update: Apr 6, 2026
Questions: 234
FlashArray-Implementation-Specialist pdf

FlashArray-Implementation-Specialist PDF

$25.5  $84.99
FlashArray-Implementation-Specialist Engine

FlashArray-Implementation-Specialist Testing Engine

$28.5  $94.99
FlashArray-Implementation-Specialist PDF + Engine

FlashArray-Implementation-Specialist PDF + Testing Engine

$40.5  $134.99