When executing a FlashArray upgrade from the FA-405 to a FA-X Series, into which slot on CT1 must the 2 Port InfiniBand Card be installed?
An Implementation Engineer has completed cabling a DirectFlash Shelf (DFS) to the FlashArray.
Which command should the Implementation Engineer run to verify that the cabling was completed correctly?
An Implementation Engineer is installing a FlashArray//XR4 and needs to add an extra card to support a second DirectFlash Shelf. What will be the resulting pair of interfaces?
A customer has submitted a Pure Engagement Request (PER) / Implementation Workbook (IWB) and the stated array name is "123".
What is the issue with this array name?
An Implementation Engineer performs a controller upgrade. What command should the Implementation Engineer run to check I/O health?
During an intra-series upgrade from //XR3 to //XR4, which command should the Implementation Engineer run to verify host connectivity before removing the secondary controller?
A FlashArray arrives with Purity 5.3.8 applied out of the factory. The account team requests that the array be configured with Purity 6.1.21. Which steps should the Implementation Engineer select to meet this requirement?
The Pure Engagement Request (PER) specifies that iSCSI ports ETH2 and ETH3 should be set to 10 Gb/s. After configuring the ports and connecting them to the SAN, the Implementation Engineer observes that ETH2/3 are not negotiating and display 0 b/s. The SAN is operating at 40 Gb/s, with support for up to 100 Gb/s.
What should the Implementation Engineer do to resolve this issue and complete the install?
Prior to running the puresetup newarray command, which command should an Installation Engineer run on a new install of an //XR4 array?