Spring Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

FlashArray-Implementation-Specialist Exam Dumps - Pure Storage FAIS Questions and Answers

Question # 64

An Implementation Engineer is onsite to add two 4-port FC cards to a FlashArray//X20R3. In what state should the controller be in before performing the card add procedure?

Options:

A.

Primary

B.

Secondary

C.

Standby

Buy Now
Question # 65

A client needs to upgrade Purity on their FlashArray, but is unable to wait for an available upgrade date from support.

What action should the customer take?

Options:

A.

Go through the Self-Service upgrade portal on Pure1 Manage and upgrade to the latest Purity version.

B.

Open a ticket with support, download the latest Purity version, copy to a USB flash drive, and run the pureinstall command on each controller.

C.

Log into the Purity CLI, download the latest Purity version, and run the pureinstall command on each controller.

D.

Proceed with the upgrade by executing the purendu procedure start command via the local array GUI.

Buy Now
Question # 66

How many power connections are required for the FlashArray//XL chassis?

Options:

A.

2

B.

6

C.

4

Buy Now
Question # 67

At the completion of an upgrade, what command should the Implementation Engineer run to send phonehome logs?

Options:

A.

purearray phonehome --send-logs

B.

purelogs --send-all

C.

purearray phonehome --send-today

Buy Now
Question # 68

When using FA File, where can the Implementation Engineer manage directories?

Options:

A.

Storage > File Systems

B.

Settings > Access > Directory Services

C.

Analytics > Performance > Directories

Buy Now
Question # 69

A customer has filled out the Installation Workbook. The management IP information netmask is specified as “255.255.255.223” and the gateway is specified as “10.24.18.1”. What corrective action should be taken to reconcile the IP configuration?

Options:

A.

The gateway information should be changed to 10.24.18.223.

B.

The netmask value should be changed to 255.255.255.0.

C.

The netmask value should be changed to /23.

Buy Now
Question # 70

On a FlashArray//XR4, which port is enabled for the management service by default?

Options:

A.

ETH2

B.

ETH4

C.

ETH0

Buy Now
Question # 71

Where can the NVRAM on a FlashArray//E be located?

Options:

A.

Distributed across DFMes

B.

Distributed across DFMDs

C.

Within the dedicated NVRAMS

Buy Now
Question # 72

An Implementation Engineer is onsite to replace a 22TB data pack with a new 91TB (10 x 9.1TB) data pack in a FlashArray//X90R5 Gen 2. The array is at 90% capacity. It currently has 22TB (10 x 2.2TB) in slots 0-9 and 63TB (14 x 4.5TB) in slots 10-23, configured as two separate write groups.

What is a supported method to proceed with the planned capacity migration?

Options:

A.

Add the new datapack into slots CH0.BAY24 - CH0.BAY28 and start the EVAC of the drives in slots 0-9. Install the remaining drives after the EVAC completes.

B.

Install a swing shelf, add the new data pack to the swing shelf, and evacuate the old 22TB (10 x 2.2TB) pack.

C.

Evacuate the drives from slots 0-9 into remaining capacity, then install the new data pack into those slots.

D.

Remove the 22TB data pack instantly and rebuild the missing data onto the new 91TB drives from parity.

Buy Now
Question # 73

What is the redundancy of the FlashArray//XL PSUs?

Options:

A.

1+1

B.

2+2

C.

3+1

Buy Now
Exam Name: Pure Certified FlashArray Implementation Specialist (FAIS) Exam
Last Update: Apr 6, 2026
Questions: 234
FlashArray-Implementation-Specialist pdf

FlashArray-Implementation-Specialist PDF

$25.5  $84.99
FlashArray-Implementation-Specialist Engine

FlashArray-Implementation-Specialist Testing Engine

$28.5  $94.99
FlashArray-Implementation-Specialist PDF + Engine

FlashArray-Implementation-Specialist PDF + Testing Engine

$40.5  $134.99