Question # 114

A newly constructed office complex in a drought-prone region aims to achieve LEED certification by minimizing its outdoor water use. The landscape architect considers implementing an efficient irrigation system and collecting rainwater to meet the site’s water needs. Which of the following actions would enhance irrigation efficiency while maintaining healthy plant growth in the office complex landscape?

Options:

A.

Adjusting irrigation schedules based on weather conditions

B.

Installing manually operated irrigation valves

C.

Selecting high-emissivity plant materials

D.

Increasing potable water use during dry periods

Buy Now
Question # 115

Which of the following does a facility operator need in order to optimize water consumption?

Options:

A.

Submetering systems

B.

Schedules of the occupants

C.

Operating times of the building

D.

Fixture cutsheets of waterless urinals

Buy Now
Question # 116

Which of the following organizations ' standards are referenced by the LEED rating systems?

Options:

A.

American Institute of Architects (AIA)

B.

Meeting Professionals International (MPI)

C.

National Fire Protection Association (NFPA)

D.

International Organization for Standardization (ISO)

Buy Now
Question # 117

Which of the following three phases comprise the Integrative Process?

Options:

A.

Discovery, design and construction

B.

Design, construction and feedback

C.

Discovery, implementation and feedback

D.

Study, execution and operation

Buy Now
Question # 118

Light trespass beyond the project boundary can be prevented by the use of

Options:

A.

flood light fixtures

B.

up-lighting fixtures

C.

shielded light fixtures

D.

increasing the number of light fixtures

Buy Now
Question # 119

Which of the following practices exemplifies the LEED concept of regenerative site stewardship?

Options:

A.

Creating a climate-smart forest by clearing invasive species to enhance biodiversity

B.

Constructing a community garden to promote local food production only

C.

Developing a stormwater management system using permeable pavement only

D.

Expanding impervious hardscape to simplify site maintenance

Buy Now
Question # 120

During which stage of a project is implementation of the Integrative Process most effective in improving performance?

Options:

A.

Operation

B.

Early de sign

C.

Construction

D.

Construction document

Buy Now
Question # 121

The maximum number of credits that can be achieved under Energy and Atmosphere category for Building Design and Construction: New Construction and Major Renovation is

Options:

A.

30

B.

31

C.

33

D.

35

Buy Now
Question # 122

Materials that would otherwise be discarded but are incorporated into a new building are considered to be

Options:

A.

reused materials

B.

local materials

C.

recycled materials

D.

renewable materials

Buy Now
Question # 123

Which of the following is a strategy for preventing light pollution?

Options:

A.

Install up-lighting

B.

Install shielded fixtures

C.

Install high performance windows

D.

Use dark paving materials to diminish light distribution

Buy Now
Exam Name: LEED Green Associate GAFRE Exam (LEED GA)
Last Update: Jul 10, 2026
Questions: 430
LEED-Green-Associate pdf

LEED-Green-Associate PDF

$25.5  $84.99
LEED-Green-Associate Engine

LEED-Green-Associate Testing Engine

$28.5  $94.99
LEED-Green-Associate PDF + Engine

LEED-Green-Associate PDF + Testing Engine

$40.5  $134.99