Question # 54

Which of the following options does the triple bottom line entail?

Options:

A.

Time, cost and quality

B.

People, planet and profit

C.

Energy, water and materials

D.

Health, safety and environment

Buy Now
Question # 55

Which of the following processes is conducted prior to building occupancy and removes indoor airbome contaminants by thoroughly exhausting old air and replacing it with fresh outdoor air?

Options:

A.

Bake-out

B.

Flush-out

C.

Air ejection

D.

Hot box analysis

Buy Now
Question # 56

Which of the following sites is most appropriate to encourage a walkable street design?

Options:

A.

A neighborhood that includes a diversity of use

B.

An area with a decreased building-height-to-street-width ratio

C.

A development that uses many culs-de-sac in the street design

D.

A project in an area designed with streets to facilitate increased speed limits

Buy Now
Question # 57

What plumbing fixture eliminates water use?

Options:

A.

Dual-flush toilet

B.

Low-flow lavatory

C.

WaterSense-labeled toilet

D.

Composting toilet

Buy Now
Question # 58

What is pre-consumer recycled content?

Options:

A.

Virgin material that is not utilized in production

B.

Waste material that is generated from factories

C.

Waste material that is generated by households or by commercial use

D.

Waste material that is diverted from the waste stream during the manufacturing process

Buy Now
Question # 59

What occurs when light from a parking area spreads and surplus lighting spills beyond the project boundary?

Options:

A.

Light trespass

B.

Provision of adequate lighting for the project

C.

Decrease in stress to nocturnal animals

D.

Light division

Buy Now
Question # 60

What is the minimum gross floor area required for a Building Design and Construction (BD+C) project to be eligible for certification?

Options:

A.

250 ft2 (23 m2)

B.

500 ft2 (46 m2)

C.

750 ft2 (70 m2)

D.

1000 tt2 (93 m2)

Buy Now
Question # 61

LEED stands for

Options:

A.

Leadership in Eco and Energy Design

B.

Leadership in Efficiency and Energy Design

C.

Leadership in Energy and Environmental Design

D.

Leadership in Environmental and Efficiency Design

Buy Now
Question # 62

The maximum number of points that can be achieved under the Energy and Atmosphere category for Building Design and Construction: New Construction and Major Renovation is:

Options:

A.

33

B.

35

C.

30

D.

31

Buy Now
Question # 63

Volatile organic compounds (VOCs) negatively impact which of the following entities?

Options:

A.

Quality of daylight

B.

Quality of indoor air

C.

Durability of a product

D.

Ability to recycle a product

Buy Now
Exam Name: LEED Green Associate Exam (LEED GA)
Last Update: Jun 15, 2025
Questions: 320
LEED-Green-Associate pdf

LEED-Green-Associate PDF

$34  $84.99
LEED-Green-Associate Engine

LEED-Green-Associate Testing Engine

$38  $94.99
LEED-Green-Associate PDF + Engine

LEED-Green-Associate PDF + Testing Engine

$54  $134.99