Light colored paving and cool roofs are terms referring to materials with

Options:

A.

lower emissivity and lower albedo

B.

lower emissivity and higher albedo

C.

higher emissivity and lower albedo

D.

higher emissivity and higher albedo

Buy Now
Question # 45

Relating to water efficiency in LEED. gallons per minute or liters per minute refers to the amount of

Options:

A.

stormwater runoff

B.

captured rainwater

C.

water used by flow fixtures

D.

water used by flush fixtures

Buy Now
Question # 46

When the project team develops the project and building construction budget, which of the following should be incorporated?

Options:

A.

Green power purchased from the local power company

B.

Time in the schedule for unique materials and systems

C.

Contingency allowances for additional research and analysis of options

D.

The future environmental impact of building maintenance operations

Buy Now
Question # 47

Acoustic Performance falls under which credit category?

Options:

A.

Sustainable Sites

B.

Energy and Atmosphere

C.

Materials and Resources

D.

Indoor Environmental Quality

Buy Now
Question # 48

In an effort to preserve the aquatic habitat and natural stream morphology of a fresh-water stream located downstream of a project boundary, one should consider which of the following strategies?

Options:

A.

Minimize pervious surfaces, enhance native vegetation and capture and reuse rainwater

B.

Minimize impervious surfaces, enhance native vegetation and capture and reuse rainwater

C.

Minimize pervious surfaces, implement low-impact development strategies and mimic natural systems

D.

Minimize impervious surfaces, implement high-impact development strategies and mimic natural systems

Buy Now
Question # 49

What do team members enhance by collaboration during the integrative process?

Options:

A.

Project duration

B.

Life-cycle costs

C.

Construction costs

D.

Efficiency and effectiveness of systems

Buy Now
Question # 50

The project area defined by the perimeter of a building plan is referred to as the building's

Options:

A.

shell

B.

density

C.

footprint

D.

envelope

Buy Now
Question # 51

The Montreal Protocol banned the production of

Options:

A.

freon

B.

CFCs

C.

HCFCs

D.

ammonia

Buy Now
Question # 52

An owner is looking to update the interior materials of the office while promoting a healthier indoor work environment using LEED strategies. During the materials specification, which of the following strategies can the owner take in order to achieve this goal?

Options:

A.

Specify salvaged materials

B.

Specify low-cost materials

C.

Specify low-emitting materials

D.

Specify high solar reflectance materials

Buy Now
Question # 53

Which of the following benefits could result from achieving LEED certification for a building?

Options:

A.

Preferred public parking

B.

Increased waste to landfills

C.

Qualification for tax rebates

D.

Dedicated public transportation infrastructure

Buy Now
Exam Name: LEED Green Associate Exam (LEED GA)
Last Update: Jun 15, 2025
Questions: 320
LEED-Green-Associate pdf

LEED-Green-Associate PDF

$34  $84.99
LEED-Green-Associate Engine

LEED-Green-Associate Testing Engine

$38  $94.99
LEED-Green-Associate PDF + Engine

LEED-Green-Associate PDF + Testing Engine

$54  $134.99