Labour Day Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bigdisc65

CCNP Enterprise 300-415 Full Course Free

Page: 2 / 26
Question 8

Which two services are critical for zero touch provisioning on-boarding? (Choose two)

Options:

A.

SNMP

B.

DNS

C.

DHCP

D.

AAA

E.

EMAIL

Question 9

In the Cisco SD_WAN solution, vSmart controller is responsible for which two actions? (Choose two.)

Options:

A.

Distribute crypto key information among vEdge routers

B.

Configure and monitor vEdge routers.

C.

Authenticate and authorize vEdge routers.

D.

Distribute the IP address from DHCP server to vEdge routers.

E.

Distribute route and policy information via OMP.

Question 10

Refer to the exhibit Cisco SD-WAN is deployed with controllers hosted in a data center All branches have WAN Edge devices with dual connections to the data center one via Internet and the other using MPLS Three branches out of 20 have issues with their control connections on MPLS circuit The local error refers to Control Connection Failure Which action resolves the issue*?

Options:

A.

Rectify any issues with the underlay routing configuration

B.

Match the TLOC color on the controllers and all WAN Edge devices

C.

Match certificates for the DTLS connection and Root CA must be installed first on WAN Edge devices

D.

Update the system IP on vManage and then resend it to the controllers

Question 11

Drag and drop the route verification output from show omp tlocs from the left onto the correct explanations on the right.

Options:

Page: 2 / 26
Exam Code: 300-415
Exam Name: Implementing Cisco SD-WAN Solutions (ENSDWI)
Last Update: Apr 26, 2024
Questions: 359
300-415 pdf

300-415 PDF

$31.5  $90
300-415 Engine

300-415 Testing Engine

$36.75  $105
300-415 PDF + Engine

300-415 PDF + Testing Engine

$49  $140