Labour Day Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bigdisc65

Complete NCS-Core Nutanix Materials

Page: 5 / 6
Question 20

Over the period of 2 to 3 weeks, a cluster displays the following:

•Periods where Warning Alerts of memory usage over 75% are asserted

•Periods where Critical Warnings of memory usage over 90% are asserted

•Periods of slow of frozen VDI desktops have caused work stoppage or slowdown

•VDI clones have periodically not powered up when called, causing work stoppage

Which steps should be used toprioritize the administrator’s troubleshooting efforts?

Options:

A.

•Assess resource health on Hardware page

•Review the Analysis page for memory usage demand

•Determine the VDI workload-to-host affinity across the cluster

B.

•Analyze Alert Pages for a root cause of memory problem

•Analyze VM table page to access the VM functionality

•Analyze the VDI Clone properties for possible VDI Workload stress

C.

•Check Analysis page for CPU demand

•Verify VDI workload property for memory subscription

•Review theHardware page to determine if the cluster has sufficient RAM

D.

•Review Analysis Page for memory use pattern

•Alert with VDI workload demand

•Analyze current and future workload in the Capacity Runaway tab for sufficient resources

Question 21

A customer has engaged a Nutanix consultant to deploy a cluster consisting of two NX-3460-G6 blocks. The consultant arrives at the customer site and fines the following:

* One rack with a total of 5U available

* Two ToR switches with 14 total available ports

* Dual PDUs with six available sockets

What will prevent the consultant from successfully installing the cluster?

Options:

A.

Insufficient sockets for power allocation.

Rack space may not be continuous.

B.

Insufficient rack space for block installation.

Insufficient sockets for power allocation.

C.

Insufficient network ports for communication.

Insufficient sockets for power allocation.

D.

Insufficient network ports for communication.

Insufficient sockets for power allocation.

E.

Insufficient network ports for communication.

Rack space may not be continuous.

Question 22

An administrator needs to replace an aging SAN and move to a hyper-converged infrastructure. The existing environment consists of the following hosts that are connected to the SAN:

• 5xAIX hosts

• 3x Hyper-V hosts

• 9xESXi hosts

• 2x physical SQL Clusters(Windows Server 2012R2 hosts)

After deploying a Nutanix AHV cluster, which two actions should the administrator take to meet the requirements? (Choose two.)

Options:

A.

Deploy Volumes to support the AIX and SQL workloads.

B.

Migrate the ESXI workloads to AHVusing Move.

C.

Deploy Files to support the AIX hosts.

D.

Migrate the ESXi and Hyper-V workloads using Move.

Question 23

A consultant is performing a Nutanix Cluster installation on Dell XC Core hardware. The consultant decides to use Foundation Portable for Mac to perform the installation. When the consultant arrives onsite, Foundation Portable is unable to locate the new nodes.

Which log should the consultant check to troubleshoot this issue?

Options:

A.

/home/nutanix/foundation/log

B.

~/data/logs/foundation.out

C.

foundation.app/contents/resouces/log

D.

~/data/logs/foundation

Page: 5 / 6
Exam Code: NCS-Core
Exam Name: Nutanix Certified Services Core Infrastructure Professional
Last Update: May 1, 2024
Questions: 191
NCS-Core pdf

NCS-Core PDF

$28  $80
NCS-Core Engine

NCS-Core Testing Engine

$33.25  $95
NCS-Core PDF + Engine

NCS-Core PDF + Testing Engine

$45.5  $130