Question 12

During a six-node cluster deployment, one node fails to image successfully and Foundation is unable to automatically configure the cluster. The consultant decides to manually complete cluster formation with the successful nodes, then expand the cluster with the remaining unconfigured node.

Which command should be used to begin the process?

Options:

A.

cluster status

B.

cluster create

C.

cluster start

D.

cluster expand

Question 13

An administrator recently added in 3 nodes to an existing 5 node cluster. While 1 node came with its own block, theother 2 nodes where added to an existing share. After adding the nodes, the administrator sees that the hardware tab displays the correct number of nodes, but incorrect position in the diagram tab.

What should the administrator do to resolve the issue?

Options:

A.

Check the factory_config.json for all 3 nodes

B.

SSH into CVM and perform genesis restart on each CVM

C.

SSH into the CVMs and run genesis acropolis stop; cluster start

D.

Check the factory_config. json for the two single nodes.

Question 14

A consultant is setting up a new vSphere cluster. Customer requirements are as follows:

* VMs should automatically failover to another host if the host crashes

* Host CPU and Memory resources should be evenly balanced

* New VMs should be placed on the host with the most resources available

Which two settings should be turned on to meet the requirements? (Choose two.)

Options:

A.

vShpere DRS

B.

vSphere HA

C.

vSphere vMotion

D.

vSphere Power Management

Question 15

A CEO asks the IT administrator to provide a list of required resources to protect current workloads and the two new SQL servers from a disaster. The Nutanix environment is managed by Prism Central.

Which option explains how to meet the CEO's request?

Options:

A.

In Capacity Runway, select Optimize Resources and select all VMs that must be protected.

B.

Create a new project and assign theVMs to it to get compute and storage requirements.

C.

Create a new scenario based on a new cluster based on a VM Profile and select Recommend.

D.

Create a new Recovery policy by selecting the VM that needs to be protected and get hardwarerequirements.

Page: 3 / 6
Exam Code: NCS-Core
Exam Name: Nutanix Certified Services Core Infrastructure Professional
Last Update: May 1, 2024
Questions: 191
NCS-Core pdf

NCS-Core PDF

$28  $80
NCS-Core Engine

NCS-Core Testing Engine

$33.25  $95
NCS-Core PDF + Engine

NCS-Core PDF + Testing Engine

$45.5  $130