Question 16

Which one of the following is not part of John Adair’s 'action-centred leadership' model?

Options:

A.

Task

B.

Individual

C.

Team

D.

Product

Question 17

Within the overall philosophy of just-in-time production, a signalling system to indicate when the next stage of the production process needs output from the previous stage, is called:

Options:

A.

Heijunka

B.

Kaizen

C.

Kanban

D.

Lankan

Question 18

‘Using expensive equipment for a task when the same task could be done more simply and cheaper another way. Sometimes called “using a sledgehammer to crack a nut” ’. Which one of the ‘wastes’ is being described here?

Options:

A.

Motion

B.

Overproduction

C.

Transportation

D.

Excessive processing

Question 19

Thinking about the PESTEL model, under which category would climate change most suitably fall?

Options:

A.

Environmental

B.

Legal

C.

Economic

D.

Socio-cultural

Page: 4 / 6
Exam Code: L3M4
Exam Name: Team Dynamics and Change
Last Update: May 3, 2024
Questions: 90
L3M4 pdf

L3M4 PDF

$28  $80
L3M4 Engine

L3M4 Testing Engine

$33.25  $95
L3M4 PDF + Engine

L3M4 PDF + Testing Engine

$45.5  $130