When a project team sustainably develops a project site, the design should
Which of the following is a leadership extraction practice that rewards projects for choosing materials with closed-loop recycling and take-back programs in LEED?
Several Materials and Resources credits give a bonus location valuation factor, which allows products extracted,
manufactured and produced within 100 mi. (161 km) of the project to take double valuation in credit calculations. The
intent of this bonus is
A design team is working on a hospital project. In order to meet the Energy and Atmosphere Prerequisite, Minimum
Energy Performance, what option is used?