Pass LEED-AP-BD+C Exam Guide

Page: 15 / 17
Question 60

When a project team sustainably develops a project site, the design should

Options:

A.

increase water runoff

B.

maximize construction pollution

C.

remediate sites already in decline

D.

replace natural water flow patterns

Question 61

Which of the following is a leadership extraction practice that rewards projects for choosing materials with closed-loop recycling and take-back programs in LEED?

Options:

A.

Material reuse

B.

Bio-based elements

C.

Extended producer responsibility

D.

Forest Stewardship Council (FSC) wood products

Question 62

Several Materials and Resources credits give a bonus location valuation factor, which allows products extracted,

manufactured and produced within 100 mi. (161 km) of the project to take double valuation in credit calculations. The

intent of this bonus is

Options:

A.

to shorten construction duration by reducing shipping times

B.

to avoid spreading products with potentially invasive non-native pests

C.

to incentivize the purchase of products that support the local economy

D.

to promote design with indigenous materials in order to maintain local aesthetic quality

Question 63

A design team is working on a hospital project. In order to meet the Energy and Atmosphere Prerequisite, Minimum

Energy Performance, what option is used?

Options:

A.

Whole building simulation

B.

EPA target finder rating tool

C.

Green-e Energy

D.

Advanced building core performance guide

Page: 15 / 17
Exam Code: LEED-AP-BD+C
Exam Name: LEED AP Building Design + Construction (LEED AP BD+C)
Last Update: May 19, 2024
Questions: 232
LEED-AP-BD+C pdf

LEED-AP-BD+C PDF

$28  $80
LEED-AP-BD+C Engine

LEED-AP-BD+C Testing Engine

$33.25  $95
LEED-AP-BD+C PDF + Engine

LEED-AP-BD+C PDF + Testing Engine

$45.5  $130